MetalsGoWhere

← All research packages

RESEARCH DATA PACKS

Aluminium supply research

In 2025, Alma’s primary aluminium production increased by 2,000 t (0.41%) to 485,000 t, compared with 2024.

Source: Rio Tinto.

Purchasing is not open yet. The copper sample is free to download.

What the package does for you

  1. Build your supply model

    Project figures arrive with period, product, unit and ownership basis already aligned.

  2. Explain the change

    Start with previous and current values, absolute change and a comparable percentage.

  3. Cite the evidence

    Follow each figure to its original disclosure and precise source location.

This edition

The 2026-10-19 edition contains Excel workbooks, CSV/JSON data, a source index and bilingual briefs. Figures are mainly 2025 disclosures, each with its exact period. A purchase covers this edition; future updates are not included.

Projects with annual output
22
Year-on-year comparisons
3

What is inside

Selected projects; 100% project basis unless stated

Swipe horizontally to see the period and source.

Selected projects; 100% project basis unless stated
ProjectProductQuantityPeriodSource
Alouette · Sept-ÎlesPrimary aluminium616,000 t2025Rio Tinto
Tiwai PointPrimary aluminium315,000 t2025Rio Tinto
Al Taweelah · AluminaAlumina2,400,000 t2025EGA
Arvida AP60Primary aluminium60,000 t2025Rio Tinto

These projects are examples, not a ranking or a market total.

Primary aluminium and alumina are separate groups. Alba’s differently labelled finished-metal indicator is restricted and excluded from usable baseline counts.

From the research brief

How to use it

In 2025, Alma’s primary aluminium production increased by 2,000 t (0.41%) to 485,000 t, compared with 2024.

Source: Rio Tinto.

In 2025, Alouette · Sept-Îles’s primary aluminium production decreased by 16,000 t (2.53%) to 616,000 t, compared with 2024.

Source: Rio Tinto.

Use primary aluminium and alumina separately. The two Shenhuo figures are capacity and are not counted as output.

Rio Tinto figures are rounded to thousand tonnes on a 100% project basis. Bauxite is reported as published, without a common moisture basis.

Includes 2 year-on-year comparisons for 2024–2025. No monthly data.

What you get

Files in each pack

Eight single-metal packs and one all-metals pack, each with Excel workbooks, CSV, JSON and bilingual briefs.

Start with the free sample

The copper sample shows the table structure, source references and methods. It is free to download.

Purchasing is not open yet; the copper sample is free to download.