RESEARCH DATA PACKS
Aluminium supply research
In 2025, Alma’s primary aluminium production increased by 2,000 t (0.41%) to 485,000 t, compared with 2024.
Source: Rio Tinto.
What the package does for you
Build your supply model
Project figures arrive with period, product, unit and ownership basis already aligned.
Explain the change
Start with previous and current values, absolute change and a comparable percentage.
Cite the evidence
Follow each figure to its original disclosure and precise source location.
This edition
The 2026-10-19 edition contains Excel workbooks, CSV/JSON data, a source index and bilingual briefs. Figures are mainly 2025 disclosures, each with its exact period. A purchase covers this edition; future updates are not included.
- Projects with annual output
- 22
- Year-on-year comparisons
- 3
What is inside
Selected projects; 100% project basis unless stated
Swipe horizontally to see the period and source.
| Project | Product | Quantity | Period | Source |
|---|---|---|---|---|
| Alouette · Sept-Îles | Primary aluminium | 616,000 t | 2025 | Rio Tinto |
| Tiwai Point | Primary aluminium | 315,000 t | 2025 | Rio Tinto |
| Al Taweelah · Alumina | Alumina | 2,400,000 t | 2025 | EGA |
| Arvida AP60 | Primary aluminium | 60,000 t | 2025 | Rio Tinto |
These projects are examples, not a ranking or a market total.
Primary aluminium and alumina are separate groups. Alba’s differently labelled finished-metal indicator is restricted and excluded from usable baseline counts.
From the research brief
How to use it
In 2025, Alma’s primary aluminium production increased by 2,000 t (0.41%) to 485,000 t, compared with 2024.
Source: Rio Tinto.
In 2025, Alouette · Sept-Îles’s primary aluminium production decreased by 16,000 t (2.53%) to 616,000 t, compared with 2024.
Source: Rio Tinto.
Use primary aluminium and alumina separately. The two Shenhuo figures are capacity and are not counted as output.
Rio Tinto figures are rounded to thousand tonnes on a 100% project basis. Bauxite is reported as published, without a common moisture basis.
Includes 2 year-on-year comparisons for 2024–2025. No monthly data.
What you get
Files in each pack
Eight single-metal packs and one all-metals pack, each with Excel workbooks, CSV, JSON and bilingual briefs.
Start with the free sample
The copper sample shows the table structure, source references and methods. It is free to download.
Purchasing is not open yet; the copper sample is free to download.