MetalsGoWhere

Copper research sample / Free download

Turn copper disclosures
into a working research table

Filter projects, locate changes and check the original evidence. A workbook, a real change log and a bilingual newsletter use the same records to reduce source hunting, retyping and version comparison.

8 annual project records · 6 historical changes · 11 sources
Prepared 14 October 2026. A retrospective demonstration, not an October 2026 monitoring report.

Try three research tasks

01 / Build a baseline

Find the Chilean annual records

Filter Projects by CL to find Candelaria, Caserones, Centinela and Los Pelambres. Keep the period, output basis, status and source with each number.

Preparation already done: locating disclosures, transcribing output, and matching projects and periods.

02 / Update guidance

Trace withdrawal and revisions

Use CU-001, CU-003 and CU-005. A withdrawn forecast stays blank, earlier versions remain visible and source locations are linked.

Preparation already done: comparing old releases and rebuilding the guidance timeline.

03 / Track operations

Separate transport, mining and expansion

Use CU-002, CU-004 and CU-006 to distinguish a partial restart, restored transport and commercial production at an expansion.

Preparation already done: reconstructing operating status and identifying double-counting risks.

An annual baseline you can use

All eight records cover calendar 2025, in tonnes of copper on a 100% project basis. This selected sample is not a ranking or global coverage estimate.

On narrow screens, scroll the table horizontally to read the full basis.

ProjectCountry2025 output (t)Status and reporting boundary
Las BambasPE410,834Reported
Copper contained in concentrate, full year, 100% project.
Kamoa-KakulaCD385,808Reported
Phases 1–3 concentrators only. Excludes 3,030 t from the slag concentrator; issuer total is 388,838 t.
KansanshiZM181,000Preliminary
Preliminary output, reported as 181 kt, including S3. Not replaced with later final results.
SentinelZM189,000Preliminary
Preliminary output, reported as 189 kt. Excludes Enterprise nickel.
CandelariaCL145,471Reported
Issuer explicitly reports 100% production; do not multiply by Lundin’s 80% ownership.
CaseronesCL132,881Reported
Issuer explicitly reports 100% production; do not multiply by Lundin’s 70% ownership.
CentinelaCL240,400Reported
Concentrate copper plus cathodes. Do not add child facilities. Page publication date not stated.
Los PelambresCL295,300Reported
Full-project annual copper output; do not scale by 60% ownership. Page publication date not stated.

The two First Quantum records retain their preliminary status. Kamoa-Kakula uses phases 1–3 concentrator output and excludes the slag concentrator. No cross-project total is calculated.

Read the update, then use the data

The newsletter explains what changed, which field to update and what evidence to follow next. Stable record IDs connect each story to the workbook and CSV files.

Measure the time saved on your own task

The sample organizes source links, names, periods, before-and-after states and reporting differences. You decide how each change fits your model.

The timing cells are intentionally blank. Complete the same task manually and with the sample, check that the answers agree, then record both times. Time savings have not yet been measured.

This sample is free to download. Pricing and purchase arrangements for the full baseline and recurring updates are still to be determined. Original reports remain on issuer websites and are not redistributed in this download.