Kamoa-Kakula · Guidance withdrawn
Annual guidance of 520,000–580,000 t → Annual guidance withdrawn; no new range given
Disclosed: 2025-01-08 → 2025-05-26
Withdrawal is neither zero output nor a loss of 520,000–580,000 t.
RESEARCH DATA PACKS
Las Bambas produced 410,834 t copper in concentrate in 2025. Kamoa-Kakula’s phases 1–3 concentrators produced 385,808 t, excluding slag recovery.
Source: MMG, Ivanhoe Mines.
Project figures arrive with period, product, unit and ownership basis already aligned.
Start with previous and current values, absolute change and a comparable percentage.
Follow each figure to its original disclosure and precise source location.
The 2026-10-19 edition contains Excel workbooks, CSV/JSON data, a source index and bilingual briefs. Figures are mainly 2025 disclosures, each with its exact period. A purchase covers this edition; future updates are not included.
Selected projects; 100% project basis unless stated
Swipe horizontally to see the period and source.
| Project | Product | Quantity | Period | Source |
|---|---|---|---|---|
| Radomiro Tomic | Divisional copper output | 295,000 t | 2025 | Codelco |
| Sentinel | Copper output (no product split disclosed) | 189,000 t | 2025 | First Quantum |
| Caserones | Concentrate copper + cathodes | 132,881 t | 2025 | Lundin Mining |
| El Teniente | Divisional copper output | 310,000 t | 2025 | Codelco |
These projects are examples, not a ranking or a market total.
From the research brief
Las Bambas produced 410,834 t copper in concentrate in 2025. Kamoa-Kakula’s phases 1–3 concentrators produced 385,808 t, excluding slag recovery.
Source: MMG, Ivanhoe Mines.
Actual output and production guidance are kept apart: guidance raises, cuts and withdrawals are listed separately and never mixed with output.
The cases below are 2025–2026 disclosures. Kamoa-Kakula’s 385,808 t is phases 1–3 concentrator output, excluding slag recovery; the company’s broader annual total of 388,838 t is not directly comparable.
Also includes six notable copper disclosures from 2025–2026. No monthly data.
Annual guidance of 520,000–580,000 t → Annual guidance withdrawn; no new range given
Disclosed: 2025-01-08 → 2025-05-26
Withdrawal is neither zero output nor a loss of 520,000–580,000 t.
Underground mining at Kakula suspended → Western-side mining restarted; eastern work remained
Disclosed: 2025-05-26 → 2025-06-11
The western restart is not a restart of the whole complex. No tonnage loss is estimated.
Eight single-metal packs and one all-metals pack, each with Excel workbooks, CSV, JSON and bilingual briefs.
The copper sample shows the table structure, source references and methods. It is free to download.
Purchasing is not open yet; the copper sample is free to download.