MetalsGoWhere

← All research packages

RESEARCH DATA PACKS

Copper supply research

Las Bambas produced 410,834 t copper in concentrate in 2025. Kamoa-Kakula’s phases 1–3 concentrators produced 385,808 t, excluding slag recovery.

Source: MMG, Ivanhoe Mines.

Purchasing is not open yet. The copper sample is free to download.

What the package does for you

  1. Build your supply model

    Project figures arrive with period, product, unit and ownership basis already aligned.

  2. Explain the change

    Start with previous and current values, absolute change and a comparable percentage.

  3. Cite the evidence

    Follow each figure to its original disclosure and precise source location.

This edition

The 2026-10-19 edition contains Excel workbooks, CSV/JSON data, a source index and bilingual briefs. Figures are mainly 2025 disclosures, each with its exact period. A purchase covers this edition; future updates are not included.

Projects with annual output
25
Year-on-year comparisons
2

What is inside

Selected projects; 100% project basis unless stated

Swipe horizontally to see the period and source.

Selected projects; 100% project basis unless stated
ProjectProductQuantityPeriodSource
Radomiro TomicDivisional copper output295,000 t2025Codelco
SentinelCopper output (no product split disclosed)189,000 t2025First Quantum
CaseronesConcentrate copper + cathodes132,881 t2025Lundin Mining
El TenienteDivisional copper output310,000 t2025Codelco

These projects are examples, not a ranking or a market total.

From the research brief

How to use it

Las Bambas produced 410,834 t copper in concentrate in 2025. Kamoa-Kakula’s phases 1–3 concentrators produced 385,808 t, excluding slag recovery.

Source: MMG, Ivanhoe Mines.

Actual output and production guidance are kept apart: guidance raises, cuts and withdrawals are listed separately and never mixed with output.

The cases below are 2025–2026 disclosures. Kamoa-Kakula’s 385,808 t is phases 1–3 concentrator output, excluding slag recovery; the company’s broader annual total of 388,838 t is not directly comparable.

Also includes six notable copper disclosures from 2025–2026. No monthly data.

Kamoa-Kakula · Guidance withdrawn

Annual guidance of 520,000–580,000 t → Annual guidance withdrawn; no new range given

Disclosed: 2025-01-08 → 2025-05-26

Withdrawal is neither zero output nor a loss of 520,000–580,000 t.

Kamoa-Kakula · Partial restart

Underground mining at Kakula suspended → Western-side mining restarted; eastern work remained

Disclosed: 2025-05-26 → 2025-06-11

The western restart is not a restart of the whole complex. No tonnage loss is estimated.

What you get

Files in each pack

Eight single-metal packs and one all-metals pack, each with Excel workbooks, CSV, JSON and bilingual briefs.

Start with the free sample

The copper sample shows the table structure, source references and methods. It is free to download.

Purchasing is not open yet; the copper sample is free to download.