MetalsGoWhere

← All research packages

RESEARCH DATA PACKS

Iron ore supply research

Sishen: 25,289,000 wet t in 2025, the sum of disclosed H1, Q3 and Q4 figures.

Source: Anglo American.

Purchasing is not open yet. The copper sample is free to download.

What the package does for you

  1. Build your supply model

    Project figures arrive with period, product, unit and ownership basis already aligned.

  2. Explain the change

    Start with previous and current values, absolute change and a comparable percentage.

  3. Cite the evidence

    Follow each figure to its original disclosure and precise source location.

This edition

The 2026-10-19 edition contains Excel workbooks, CSV/JSON data, a source index and bilingual briefs. Figures are mainly 2025 disclosures, each with its exact period. A purchase covers this edition; future updates are not included.

Projects with annual output
12
Year-on-year comparisons
1

What is inside

Selected projects; 100% project basis unless stated

Swipe horizontally to see the period and source.

Selected projects; 100% project basis unless stated
ProjectProductQuantityPeriodSource
KolomelaKumba lump and fines, wet10,795,000 wet t2025Anglo American
SishenKumba lump and fines, wet25,289,000 wet t2025Anglo American
Iron BridgeIron Bridge concentrate shipments, wet9,000,000 wet tFY ended 2026-06-30Fortescue June 2026 Quarterly Production Report
Hematite · FortescueHematite shipments, wet192,300,000 wet tFY ended 2026-06-30Fortescue June 2026 Quarterly Production Report

These projects are examples, not a ranking or a market total.

Wet tonnes remain wet tonnes. Shipments and processing are separate measures, not substituted for production.

From the research brief

How to use it

Sishen: 25,289,000 wet t in 2025, the sum of disclosed H1, Q3 and Q4 figures.

Source: Anglo American.

Kolomela: 10,795,000 wet t in 2025, the sum of disclosed H1, Q3 and Q4 figures.

Source: Anglo American.

Figures stay in wet tonnes and fiscal periods. Shipments are not output, and no generic moisture conversion is applied.

Kumba and Minas-Rio differ in product and moisture basis. Chinese projects have design capacity only, with no actual output disclosed, and are listed separately.

This commodity currently has 2025 figures only; no comparable earlier year yet.

What you get

Files in each pack

Eight single-metal packs and one all-metals pack, each with Excel workbooks, CSV, JSON and bilingual briefs.

Start with the free sample

The copper sample shows the table structure, source references and methods. It is free to download.

Purchasing is not open yet; the copper sample is free to download.