MetalsGoWhere

← All research packages

RESEARCH DATA PACKS

Lead supply research

In 2025, Sasa’s lead in concentrate production decreased by 1,461 t (5.49%) to 25,156 t, compared with 2024.

Source: Central Asia Metals.

Purchasing is not open yet. The copper sample is free to download.

What the package does for you

  1. Build your supply model

    Project figures arrive with period, product, unit and ownership basis already aligned.

  2. Explain the change

    Start with previous and current values, absolute change and a comparable percentage.

  3. Cite the evidence

    Follow each figure to its original disclosure and precise source location.

This edition

The 2026-10-19 edition contains Excel workbooks, CSV/JSON data, a source index and bilingual briefs. Figures are mainly 2025 disclosures, each with its exact period. A purchase covers this edition; future updates are not included.

Projects with annual output
8
Year-on-year comparisons
6

What is inside

Selected projects; 100% project basis unless stated

Swipe horizontally to see the period and source.

Selected projects; 100% project basis unless stated
ProjectProductQuantityPeriodSource
SasaLead in concentrate25,156 t2025Central Asia Metals
Dugald RiverLead in concentrate21,666 t2025MMG
RoseberyLead in products17,942 t2025MMG

These projects are examples, not a ranking or a market total.

From the research brief

How to use it

In 2025, Sasa’s lead in concentrate production decreased by 1,461 t (5.49%) to 25,156 t, compared with 2024.

Source: Central Asia Metals.

Lead in concentrate feeds a mine supply model directly. Smelter figures use mixed bases; confirm each before estimating refined supply.

These are annual figures for selected projects, not a complete lead balance. MMG’s website figures differ slightly from its dated report through rounding.

Includes 1 year-on-year comparison for 2024–2025. No monthly data.

What you get

Files in each pack

Eight single-metal packs and one all-metals pack, each with Excel workbooks, CSV, JSON and bilingual briefs.

Start with the free sample

The copper sample shows the table structure, source references and methods. It is free to download.

Purchasing is not open yet; the copper sample is free to download.