RESEARCH DATA PACKS
Nickel supply research
In 2025, Ramu / Basamuk’s nickel-in-MHP production increased by 4,338 t (15.13%) to 33,007 t, compared with 2024.
Source: Nickel 28.
What the package does for you
Build your supply model
Project figures arrive with period, product, unit and ownership basis already aligned.
Explain the change
Start with previous and current values, absolute change and a comparable percentage.
Cite the evidence
Follow each figure to its original disclosure and precise source location.
This edition
The 2026-10-19 edition contains Excel workbooks, CSV/JSON data, a source index and bilingual briefs. Figures are mainly 2025 disclosures, each with its exact period. A purchase covers this edition; future updates are not included.
- Projects with annual output
- 10
- Year-on-year comparisons
- 4
What is inside
Selected projects; 100% project basis unless stated
Swipe horizontally to see the period and source.
| Project | Product | Quantity | Period | Source |
|---|---|---|---|---|
| Weda Bay · PT WBN | Nickel in NPI | 35,800 t | 2025 | Eramet |
| Ramu / Basamuk | Nickel in MHP | 33,007 t | 2025 | Nickel 28 |
These projects are examples, not a ranking or a market total.
From the research brief
How to use it
In 2025, Ramu / Basamuk’s nickel-in-MHP production increased by 4,338 t (15.13%) to 33,007 t, compared with 2024.
Source: Nickel 28.
Use MHP and NPI separately. Ramu’s year-on-year change is based on its disclosed 2024 output.
Both are nickel content, not refined nickel or intermediate product mass. Ramu’s 2025 figure is preliminary.
Includes 1 year-on-year comparison for 2024–2025. No monthly data.
What you get
Files in each pack
Eight single-metal packs and one all-metals pack, each with Excel workbooks, CSV, JSON and bilingual briefs.
Start with the free sample
The copper sample shows the table structure, source references and methods. It is free to download.
Purchasing is not open yet; the copper sample is free to download.