MetalsGoWhere

← All research packages

RESEARCH DATA PACKS

Tin supply research

In 2025, PT Timah mining — reported group’s tin in concentrate production decreased by 802 t (4.13%) to 18,635 t, compared with 2024.

Source: PT Timah official operational performance.

Purchasing is not open yet. The copper sample is free to download.

What the package does for you

  1. Build your supply model

    Project figures arrive with period, product, unit and ownership basis already aligned.

  2. Explain the change

    Start with previous and current values, absolute change and a comparable percentage.

  3. Cite the evidence

    Follow each figure to its original disclosure and precise source location.

This edition

The 2026-10-19 edition contains Excel workbooks, CSV/JSON data, a source index and bilingual briefs. Figures are mainly 2025 disclosures, each with its exact period. A purchase covers this edition; future updates are not included.

Projects with annual output
8
Year-on-year comparisons
2

What is inside

Selected projects; 100% project basis unless stated

Swipe horizontally to see the period and source.

Selected projects; 100% project basis unless stated
ProjectProductQuantityPeriodSource
BisieTin in concentrate18,576 t2025Alphamin Resources
MSC smelting divisionRefined tin14,224 t2025MSC Annual Report 2025
VintoGrade A-1 refined tin10,643.51 t2025Empresa Metalurgica Vinto
PT Timah refined — reported groupRefined tin17,815 t2025PT Timah official operational performance

These projects are examples, not a ranking or a market total.

From the research brief

How to use it

In 2025, PT Timah mining — reported group’s tin in concentrate production decreased by 802 t (4.13%) to 18,635 t, compared with 2024.

Source: PT Timah official operational performance.

In 2025, PT Timah refined — reported group’s refined tin production decreased by 1,100 t (5.82%) to 17,815 t, compared with 2024.

Source: PT Timah official operational performance.

Use mine and smelter figures separately. Timah’s year-on-year changes use the company’s disclosed prior-year mine and refined output.

MSC output is a division total, not Pulau Indah output. Cross-stage addition would double count feed and metal.

Includes 2 year-on-year comparisons for 2024–2025. No monthly data.

What you get

Files in each pack

Eight single-metal packs and one all-metals pack, each with Excel workbooks, CSV, JSON and bilingual briefs.

Start with the free sample

The copper sample shows the table structure, source references and methods. It is free to download.

Purchasing is not open yet; the copper sample is free to download.