Weekly update 22-28 Sep: El Teniente processes ore at 78.1 kt/day

As of 2026-10-08 · Observation periods are shown separately.

2025-09-29 · Weekly update 22-28 Sep: El Teniente processes ore at 78.1 kt/day · Direction: Higher

Disclosed facts

Swipe horizontally to see the full table.

AssertionDisclosure
Reported production or shipmentsOre processing averaged 78.1 thousand tonnes per day between Sewell and Colón.
Operational scopeThe smelter ran with Converter Teniente 1 and gas-cleaning plant 2, and 533 fine tonnes per day were molded over the weekend.

Disclosure boundary

Throughput, not copper production; the Colón/Sewell split as printed does not sum to 78.1.