MetalsGoWhere

METALSGOWHERE ATLAS · SUPPLY RESEARCH

Copper supply, from countries to projects

As of 2026-10-14 · Observation periods are shown separately.

A mine map and a national production table answer different questions. Begin with country-level mine production, then investigate where copper is processed and which projects are represented.

Copper research, ready to work with

Project-level tables, comparable historical changes and source-linked workbooks. Explore what the research packages contain.

Research packs Preview available · purchasing not open

Follow the evidence

COUNTRY EVIDENCE · 2025 ESTIMATES

Copper mine production by country

Compare selected countries

2025 · estimated · Mine production · contained copper · Mt (million metric tonnes)

2025 · estimated

Selected countries with published production figures; this is not a complete world ranking.

Swipe horizontally to see the full table.

Selected country production · thousand metric tonnes of contained copper
CountryProductionData periodOriginal source
Chile5,3002025 estimatedPrinted p. 73; 2025 estimate column
Congo (Kinshasa)3,2002025 estimatedPrinted p. 73; 2025 estimate column
Peru2,7002025 estimatedPrinted p. 73; 2025 estimate column
China1,8002025 estimatedPrinted p. 73; 2025 estimate column
Russia1,3002025 estimatedPrinted p. 73; 2025 estimate column
United States1,0002025 estimatedPrinted p. 73; 2025 estimate column

Selected countries from USGS Mineral Commodity Summaries 2026, February edition. All figures above are 2025 estimates, not 2026 output. This is not a complete world ranking. Country totals are independent of the projects included in Atlas.

What these figures answer

They compare selected countries on the same annual mine-production basis. They do not measure smelter output, refinery output or ore tonnage.

What a project map adds

A map helps locate the assets represented in Atlas and frame more specific questions. Missing sites, reporting boundaries and data periods prevent the selected project collection from serving as a complete country total.

Try a focused research path

  1. Read a country figure above and open its original source.
  2. Check which production stage and year the figure describes.
  3. Open the copper view in Atlas and inspect a relevant project.
  4. Compare its reporting basis with the national statistic before drawing a conclusion.

How to compare production and capacity · Coverage and source notes

Common research questions

Does Atlas include every operating site?

No. Atlas is a selected research collection. Check the coverage notes for the relevant metal; a missing marker is not evidence that a facility does not exist.

Are these real-time production figures?

No. These country figures describe 2025 estimates published in February 2026. The page review date is not a new observation date.

Can production and capacity be compared directly?

Only after checking the material, stage, reporting boundary and period. Capacity is not realised output.

Cite this research page

MetalsGoWhere Atlas, “Copper supply, from countries to projects.” Checked on 2026-09-18. https://metalsgowhere.com/atlas/en/copper/. Include your access date when citing.

Where statistics are shown, credit USGS, Mineral Commodity Summaries 2026, February edition, for the 2025 estimates; use the original chapter and page linked beside the figure. MetalsGoWhere provides the research presentation and comparison method. Hypothetical examples are not statistical observations. Other source links identify supporting context, not additional published production series.

Explore country evidence

Read project evidence ↓

Try the copper research sample

Explore the workbook, historical changes and sample newsletter, with reporting periods and original sources.

Project evidence directory

Grouped by production stage. Periods, products and scopes differ between projects, so entries are not a ranking and should not be added up.

Processing

Guixi smelter

China · Processing · Single site

Operator: Jiangxi Copper

Nameplate capacity: 1,000,000 t/year · Period: Not disclosed · Basis: Copper cathode · 100% project basis

Source: Jiangxi Copper 2025 Sustainability Report · 2026-03-27

2025 company report declares 1 Mt/year cathode capacity; this is not CY2025 production.

Korea Zinc Onsan

Korea, Republic of · Processing · Single site

Operator: Korea Zinc

Nameplate capacity: 65,000 t/year · Period: Not disclosed · Basis: Copper cathode · 100% project basis

Source: Korea Zinc 2025 Annual Report (corrected KRX filing) · 2026-06-01

Production: 33,001 t · Period: 2025-01-01 — 2025-12-31 · Basis: Copper cathode · 100% project basis

Source: Korea Zinc 2025 Annual Report (corrected KRX filing) · 2026-06-01

Corrected annual filing: parent Onsan site, excluding Australian Sun Metals. IR business-plan sales are not substituted for production.

LS MnM Onsan

Korea, Republic of · Processing · Single site

Operator: LS MnM

Nameplate capacity: 680,000 t/year · Period: Not disclosed · Basis: Copper cathode · 100% project basis

Source: LS Corp 2025 Annual Report / KRX filing · 2026-03-18

2025 capacity table identifies 680 kt/year at Onsan; financial revenue tables are not used.

Manyar / PTFI Refinery

Indonesia · Processing

Operator: PT Freeport Indonesia

Nameplate capacity: 600,000 t/year · Period: Not disclosed · Basis: cathode · facility nameplate

Source: PTFI · Manyar冶炼项目能力披露 (Chinese)

Historical design disclosure: up to 600,000 t/y cathode output. 1.7 Mt/y refers to concentrate feed, not copper. Current utilization is not verified.

Tongling Nonferrous — reported group

China · Processing · Operator group

Operator: Tongling Nonferrous

Nameplate capacity: 2,200,000 t/year · Period: Not disclosed · Basis: Copper cathode · Operator-group scope

Source: Tongling Nonferrous 2025 Annual Report · 2026-04-20

Production: 1,954,800 t · Period: 2025-01-01 — 2025-12-31 · Basis: Copper cathode · Operator-group scope

Source: Tongling Nonferrous 2025 Annual Report · 2026-04-20

Includes the Jinguan site in this catalogue. The group total is not added to individual plants.

Mines

Aktogay

Kazakhstan · Mines

Operator: KAZ Minerals

Production: 235,600 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: KAZ Minerals · 2025 全年生产报告 (Chinese) · 2026-02-20

Contained Cu in concentrate 220.3 kt plus oxide cathode 15.3 kt; non-overlapping product sum, distinct from 225.7 kt payable production.

Andina

Chile · Mines

Operator: Codelco

Production: 182,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Codelco · 2025年度业绩公告 (Chinese) · 2026-03-27

2025 divisional production from the 27 March 2026 Codelco release.

Antamina

Peru · Mines

Operator: Antamina JV

Production: 385,500 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Glencore · 2025生产报告 (Chinese)

Approximate full-project output derived from 130.1 kt at the reporting-year 33.75% share; rounding uncertainty retained.

Antapaccay

Peru · Mines

Operator: Glencore

Production: 135,938 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: MINEM · 秘鲁 2025 年矿业统计附件 (Chinese) · 2026-02-25

MINEM project contained copper; FY2025 cell F13, H1 2026 cell H19. Rounded to whole tonnes from the official workbook.

Bozshakol

Kazakhstan · Mines

Operator: KAZ Minerals

Production: 102,300 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: KAZ Minerals · 2025 全年生产报告 (Chinese) · 2026-02-20

Copper in concentrate 102.3 kt, not 97.7 kt payable copper; H1 and quarterly series use the same basis.

Buenavista del Cobre

Mexico · Mines

Operator: Southern Copper

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Candelaria

Chile · Mines

Operator: Lundin Mining

Production: 145,471 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Lundin Mining · 2025全年业绩 (Chinese)

2025 contained copper; the report explicitly uses the 100% basis, not the 80% equity share.

Centinela

Chile · Mines

Operator: Antofagasta

Production: 240,400 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Antofagasta · Centinela项目页 (Chinese)

2025 mine-complex output includes copper in concentrate and mine-site cathode output; child operations are not added again.

Cerro Verde

Peru · Mines

Operator: Freeport-McMoRan

Production: 391,450.215 t · Period: 2025-01-01 — 2025-12-31 · Basis: Recoverable copper · 100% project basis

Source: Freeport · FY2025 results · 2026-01-22

CY2025 recoverable Cu approx. 391.5 kt from 863 million lb. Consolidated output, not multiplied by FCX ownership. No global contained-mine share calculated.

Chuquicamata

Chile · Mines

Operator: Codelco

Production: 245,500 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Codelco · 2025 年产量更正表 (Chinese) · 2026-08-06

Corrected 2025 actual production supersedes the original annual report. This is a historical correction, not a 2026 guidance reduction.

Collahuasi

Chile · Mines

Operator: Collahuasi JV

Production: 403,900 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Glencore · 2025生产报告 (Chinese)

Approximate full-project output derived from 177.7 kt at the reporting-year 44% share; rounded source inputs, not direct full-project reporting.

Cuajone

Peru · Mines

Operator: Southern Copper

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Dexing copper mine

China · Mines · Single site

Operator: Jiangxi Copper

Production: Not disclosed · Period: 2025-01-01 — 2025-12-31 · Basis: Copper content in concentrate · 100% project basis

Source: Jiangxi Copper H1 2025 Annual-period filing · 2025-08-29

Major Chinese mine identity confirmed; standalone CY2025 copper content unverified. Jiangxi Copper group mine output is not allocated to Dexing.

El Teniente

Chile · Mines

Operator: Codelco

Production: 310,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Codelco · 2025年度业绩公告 (Chinese) · 2026-03-27

2025 divisional output in Codelco’s 27 March 2026 release. A source snapshot, not a claim of exhaustive revision checking.

Escondida

Chile · Mines

Operator: BHP / Rio Tinto

Production: 1,307,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: Payable copper · 100% project basis

Source: BHP · FY2025 operational review · 2025-07-18 · BHP · FY2026 operational review · 2026-07-16

CY2025 sum of four quarters, approx. 1307.0 kt. 100% site; payable concentrate copper plus cathode. Original basis retained; no world mine-share calculation.

Grasberg district

Indonesia · Mines

Operator: PT Freeport Indonesia

Production: 460,396.256 t · Period: 2025-01-01 — 2025-12-31 · Basis: Recoverable copper · 100% project basis

Source: Freeport · FY2025 results · 2026-01-22

CY2025 recoverable Cu approx. 460.4 kt from 1015 million lb. Consolidated output, not multiplied by FCX ownership. No global contained-mine share calculated.

Julong

China · Mines

Operator: Zijin Mining

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

Source: Zijin · 2025 项目经营表 (Chinese)

Julong Copper company reporting includes Julong and Zhibula mines. It cannot establish output for Julong mine alone; mine production and capacity are omitted from this map.

Kamoa-Kakula

Congo (Kinshasa) · Mines

Operator: Kamoa Copper

Production: 385,808 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Ivanhoe · 2025生产结果 (Chinese)

Uses 385,808 t from Phase 1–3 concentrators. The reported 388,838 t total also includes 3,030 t of slag recovery, excluded here.

Kamoto / KCC

Congo (Kinshasa) · Mines

Operator: Glencore / KCC

Production: 188,700 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Glencore · 2025 全年生产报告 (Chinese) · 2026-01-29

Own-source copper metal at KCC / Kamoto, 100% operation; excludes Mutanda and other Glencore assets.

Kansanshi

Zambia · Mines

Operator: First Quantum

Production: 181,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: First Quantum · 2025初步生产结果 (Chinese)

Preliminary full-year 2025 production, reported in thousand tonnes. Final annual reconciliation is pending.

Kennecott

United States · Mines

Operator: Rio Tinto

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Kisanfu

Congo (Kinshasa) · Mines

Operator: CMOC

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Las Bambas

Peru · Mines

Operator: MMG

Production: 410,834 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: MMG · 2025全年生产披露 (Chinese) · 2026-01-22

2025 copper contained in concentrate, full operation; official MMG production release.

Los Bronces

Chile · Mines · Single site

Operator: Anglo American Sur

Production: 164,600 t · Period: 2025-01-01 — 2025-12-31 · Basis: Fine copper content · 100% project basis

Source: Anglo American Chile: Los Bronces operations

164,600 tonnes of fine copper for the full operation; not scaled by the 50.1% ownership interest.

Los Pelambres

Chile · Mines

Operator: Antofagasta

Production: 295,300 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Antofagasta · Los Pelambres项目页 (Chinese)

The operator’s project page states 295,300 t in 2025; full-site production, not equity-scaled.

Lumwana

Zambia · Mines

Operator: Barrick

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Ministro Hales

Chile · Mines

Operator: Codelco

Production: 146,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Codelco · 2025 年产量更正表 (Chinese) · 2026-08-06

Corrected 2025 actual production supersedes the original annual report. This is a historical correction, not a 2026 guidance reduction.

Morenci

United States · Mines

Operator: Freeport-McMoRan

Production: 313,104.733 t · Period: 2025-01-01 — 2025-12-31 · Basis: Recoverable copper · 100% project basis

Source: Freeport · FY2025 results · 2026-01-22

CY2025 recoverable Cu approx. 313.1 kt from 497 million lb. 72% interest divided by 0.72 to obtain 100% site. No global contained-mine share calculated.

Olympic Dam

Australia · Mines

Operator: BHP

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Oyu Tolgoi

Mongolia · Mines

Operator: Oyu Tolgoi / Rio Tinto

Production: 345,200 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Oyu Tolgoi · 2026Q2业绩附2025全年表 (Chinese) · 2026-07-30

2025 full-year column in the operator’s Q2 2026 report: 345.20 kt copper in concentrate, open pit and underground combined.

Quebrada Blanca

Chile · Mines

Operator: Teck

Production: 190,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Teck · 2025生产及销售更新 (Chinese)

Preliminary 2025 operation output of 190.0 kt in Teck’s production table; sales are not substituted.

Quellaveco

Peru · Mines

Operator: Anglo American

Production: 310,216 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: MINEM · 秘鲁 2025 年矿业统计附件 (Chinese) · 2026-02-25

MINEM project contained copper; FY2025 cell F11, H1 2026 cell H16. Rounded to whole tonnes from the official workbook.

Radomiro Tomic

Chile · Mines

Operator: Codelco

Production: 295,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: Codelco · 2025年度业绩公告 (Chinese) · 2026-03-27

2025 output attributed to the division. Some sulfide ore is processed at Chuquicamata and must not be counted twice.

Sentinel

Zambia · Mines

Operator: First Quantum

Production: 189,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: First Quantum · 2025初步生产结果 (Chinese)

2025 preliminary Trident–Sentinel copper output; excludes Enterprise nickel.

Sierra Gorda

Chile · Mines

Operator: Sierra Gorda JV

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Spence

Chile · Mines

Operator: BHP

Production: 254,800 t · Period: 2025-01-01 — 2025-12-31 · Basis: Payable copper · 100% project basis

Source: BHP · FY2025 operational review · 2025-07-18 · BHP · FY2026 operational review · 2026-07-16

CY2025 sum of four quarters, approx. 254.8 kt. 100% site; payable concentrate copper plus cathode. Original basis retained; no world mine-share calculation.

Tenke Fungurume

Congo (Kinshasa) · Mines

Operator: CMOC

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Toquepala

Peru · Mines

Operator: Southern Copper

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Toromocho

Peru · Mines

Operator: Chinalco Perú

Production: 247,836 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained copper · 100% project basis

Source: MINEM · 秘鲁 2025 年矿业统计附件 (Chinese) · 2026-02-25

MINEM project contained copper; FY2025 cell F12, H1 2026 cell H17. Rounded to whole tonnes from the official workbook. Chinalco Perú corresponds to the Toromocho complex, including expansion.

Yulong

China · Mines

Operator: Western Mining

Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed

No public source yet

No public numeric source yet; location is indicative.

Source: metalsgowhere.com, as of 2026-10-14. Citation & data use