MetalsGoWhere

Kansanshi

181,183 t · derived2025-01-01 – 2025-12-31 · FY · full year · Total contained copper at the mine · 100% project basisOriginal filing
175,000–205,000 tMaintained · 2026-01-01 – 2026-12-31 · FY · full year · Total contained copper at the mine · 100% project basisOriginal filing

As of 2026-10-08 · Observation periods are shown separately.

Project background and reporting periods

Kansanshi is a copper operation in Zambia operated by First Quantum. In 2025 (2025-01-01 – 2025-12-31) it produced 181,183 t of total contained copper at the mine on a 100% project basis, as disclosed by First Quantum. The tables below keep each disclosure's own period and source; a later actual does not establish whether the original expectation was met. 2026-01-01 – 2026-12-31 · FY · full year

Latest guidance status

Swipe horizontally to see the full table.

PeriodDisclosure dateStatusGuidance rangeBasisSource
2026-01-01 – 2026-12-31 · FY · full year2026-07-28Maintained175,000–205,000 tTotal contained copper at the mine

One or more linked sources in this table lack a page anchor; no page number was inferred.

Kansanshi and 35 other copper projects in one workbook

Open the workbook to compare annual figures and follow the source for each row. 47 records and 68 sources.

Actual production

Swipe horizontally to see the full table.

PeriodValueBasisSource
2025-01-01 – 2025-12-31 · FY · full year181,183 t · derivedTotal contained copper at the mine
2026-01-01 – 2026-06-30 · H1 · cumulative89,342 t · derivedTotal contained copper at the mine
2026-04-01 – 2026-06-30 · Q2 · single quarter43,997 tTotal contained copper at the mine

One or more linked sources in this table lack a page anchor; no page number was inferred.

Reserves and resources

Swipe horizontally to see the full table.

Reporting standardValid dateValueSource
CIM 2014 / NI 43-1012025-12-31Total reserves: 5,223,930 t

One or more linked sources in this table lack a page anchor; no page number was inferred.

Basis notes

Take the latest project data

Latest project snapshot · Internal use only; no redistribution. Commercial use requires authorization.

Download latest CSV · Download latest JSON

Source: metalsgowhere.com, as of 2026-10-08. Citation & data use