Toromocho

247,836 t2025-01-01 – 2025-12-31 · FY · full year · Total contained copper at the mine · 100% project basisOriginal filing

As of 2026-10-23 · Observation periods are shown separately.

Project background and reporting periods

Toromocho is a copper operation in Peru operated by Chinalco Perú. In 2025 (2025-01-01 – 2025-12-31) it produced 247,836 t of total contained copper at the mine on a 100% project basis, as disclosed by MINEM (Peru). The tables below keep each disclosure's own period and source; a later actual does not establish whether the original expectation was met.

Actual production

Swipe horizontally to see the full table.

PeriodValueBasisSource
2025-01-01 – 2025-12-31 · FY · full year247,836 tTotal contained copper at the mine
2026-01-01 – 2026-06-30 · H1 · cumulative115,576 tTotal contained copper at the mine

One or more linked sources in this table lack a page anchor; no page number was inferred.

Toromocho and 35 other copper projects in one workbook

Open the workbook to compare annual figures and follow the source for each row. 47 records and 68 sources.

Basis notes

Take the latest project data