Escondida
As of 2026-10-23 · Observation periods are shown separately.
Project background and reporting periods
Escondida is a copper operation in Chile. In FY2026 (2025-07-01 – 2026-06-30, the issuer's fiscal year) it produced 1,261,200 t of payable copper for the fiscal year on a 100% project basis, as disclosed by BHP. The tables below keep each disclosure's own period and source; a later actual does not establish whether the original expectation was met. 2026-07-01 – 2027-06-30 · FY2027 · issuer fiscal year, not a calendar year
Latest guidance status
Swipe horizontally to see the full table.
| Period | Disclosure date | Status | Guidance range | Basis | Source |
|---|---|---|---|---|---|
| 2026-07-01 – 2027-06-30 · FY2027 · issuer fiscal year, not a calendar year | 2026-10-20 | Maintained | 1,000,000–1,100,000 t | Payable copper for the fiscal year |
Escondida and 35 other copper projects in one workbook
Open the workbook to compare annual figures and follow the source for each row. 47 records and 68 sources.
Actual production
Swipe horizontally to see the full table.
| Period | Value | Basis | Source |
|---|---|---|---|
| 2025-07-01 – 2026-06-30 · FY2026 · issuer fiscal year, not a calendar year | 1,261,200 t · approximate | Payable copper for the fiscal year | |
| 2025-07-01 – 2025-12-31 · H2 · cumulative | 646,100 t · approximate | Payable copper for the fiscal year | |
| 2025-07-01 – 2026-03-31 · 2025 | 949,300 t · approximate | Payable copper for the fiscal year | |
| 2026-07-01 – 2026-09-30 · Q3 · single quarter | 252,600 t | Payable copper for the fiscal year |
One or more linked sources in this table lack a page anchor; no page number was inferred.
Basis notes
- Payable copper for the fiscal year
Take the latest project data
Latest project snapshot · Internal use only; no redistribution. Commercial use requires authorization.
Download latest CSV · Download latest JSONSource: metalsgowhere.com, as of 2026-10-23. Citation & data use