As of 2026-11-27 · Observation periods are shown separately.
Project background and reporting periods
Las Bambas is a copper operation in Peru operated by MMG. In 2025 (2025-01-01 – 2025-12-31) it produced 410,834 t of copper contained in concentrate on a 100% project basis, as disclosed by MMG. The tables below keep each disclosure's own period and source; a later actual does not establish whether the original expectation was met. 2026-01-01 – 2026-12-31 · FY · full year
Compare the disclosures
Match the period, product, production boundary and ownership basis before subtracting. These examples retain the dates of the original disclosures.
Calculation checked on 2026-10-25 · Maintenance: MetalsGoWhere; update when the underlying disclosure changes.
How did the original range become a point forecast?
Guidance midpoint raised 5.26%
Reference guidance
360–400 kt
Revised guidance
400 kt
0448 kt
2025 · Copper contained in concentrate · 100% project basis
Lower bound change
+40,000 t (+11.11%)
Upper bound change
+0 t (+0.00%)
Midpoint change
+20,000 t (+5.26%)
Check values, sources and calculation
Swipe horizontally to see the full table.
Reference
Value / disclosure date
Observation period / basis
Original source / location
Reference disclosure
360,000–400,000 t2025-01-23
2025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis
Recompute in tonnes. A midpoint is an arithmetic reference, not an issuer point forecast. Percentage changes use the corresponding reference value; a zero denominator has no percentage.
These figures measure contained copper in concentrate on a whole-project basis. They are not concentrate mass, shipments, capacity or MMG equity share. The October point forecast differs from a mere upper-end expectation.
How far above the October forecast was the annual actual?
Actual output 10,834 t above the upper bound
Reference guidance
400 kt
Reported actual
410.834 kt
0460.134 kt
2025 · Copper contained in concentrate · 100% project basis
Actual minus lower bound
+10,834 t (+2.71%)
Actual minus upper bound
+10,834 t (+2.71%)
Check values, sources and calculation
Swipe horizontally to see the full table.
Reference
Value / disclosure date
Observation period / basis
Original source / location
Reference disclosure
400,000 t2025-10-21
2025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis
Recompute in tonnes. A midpoint is an arithmetic reference, not an issuer point forecast. Percentage changes use the corresponding reference value; a zero denominator has no percentage.
These figures measure contained copper in concentrate on a whole-project basis. They are not concentrate mass, shipments, capacity or MMG equity share. The October point forecast differs from a mere upper-end expectation.
How much production belongs to the second half?
Output for the intervening period: 200,197 t
Derived period output
200,197 t
Derived period: 2025-07-01 / 2025-12-31
Check values, sources and calculation
Swipe horizontally to see the full table.
Reference
Value / disclosure date
Observation period / basis
Original source / location
Reference disclosure
210,637 t2025-07-22
2025-01-01 / 2025-06-30Copper contained in concentrate · 100% project basis
Recompute in tonnes. A midpoint is an arithmetic reference, not an issuer point forecast. Percentage changes use the corresponding reference value; a zero denominator has no percentage.
Derived period output=410834 - 210637
These figures measure contained copper in concentrate on a whole-project basis. They are not concentrate mass, shipments, capacity or MMG equity share. The October point forecast differs from a mere upper-end expectation.
Cite this page with its project, observation period and calculation checked date. Historical examples do not establish today’s operating status or losses caused by an event.
Questions this evidence can answer
Checked: 2026-10-08 · Added: 2026-10-08
Which Las Bambas output is annual, and which guidance is the reference?
The full-year actual exceeds both the upper end of the original annual range and the later point guidance. Keep both reference points visible. Quarter-only output and cumulative half-year or nine-month output are separate periods and must not be added together.
These figures measure contained copper in concentrate on a whole-project basis. They are not concentrate mass, shipments, capacity or MMG equity share. The October point forecast differs from a mere upper-end expectation.