Las Bambas

410,834 t2025-01-01 – 2025-12-31 · FY · full year · Copper contained in concentrate · 100% project basisOriginal filing
400,000 tMaintained · 2026-01-01 – 2026-12-31 · FY · full year · Copper contained in concentrate · 100% project basisOriginal filing
Guidance midpoint raised 5.26%2025-01-23 → 2025-10-21 · 2025 · Copper contained in concentrate · 100% project basis

As of 2026-11-27 · Observation periods are shown separately.

Project background and reporting periods

Las Bambas is a copper operation in Peru operated by MMG. In 2025 (2025-01-01 – 2025-12-31) it produced 410,834 t of copper contained in concentrate on a 100% project basis, as disclosed by MMG. The tables below keep each disclosure's own period and source; a later actual does not establish whether the original expectation was met. 2026-01-01 – 2026-12-31 · FY · full year

Compare the disclosures

Match the period, product, production boundary and ownership basis before subtracting. These examples retain the dates of the original disclosures.

Calculation checked on 2026-10-25 · Maintenance: MetalsGoWhere; update when the underlying disclosure changes.

How did the original range become a point forecast?

Guidance midpoint raised 5.26%

Reference guidance
360–400 kt
Revised guidance
400 kt
2025 · Copper contained in concentrate · 100% project basis
Lower bound change
+40,000 t (+11.11%)
Upper bound change
+0 t (+0.00%)
Midpoint change
+20,000 t (+5.26%)
Check values, sources and calculation

Swipe horizontally to see the full table.

ReferenceValue / disclosure dateObservation period / basisOriginal source / location
Reference disclosure360,000–400,000 t2025-01-232025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis
Compared disclosure400,000 t2025-10-212025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis

Recompute in tonnes. A midpoint is an arithmetic reference, not an issuer point forecast. Percentage changes use the corresponding reference value; a zero denominator has no percentage.

Lower bound change=400000 - 360000

Percentage = difference / reference × 100=(400000 - 360000) / 360000 * 100

Upper bound change=400000 - 400000

Percentage = difference / reference × 100=(400000 - 400000) / 400000 * 100

Midpoint change=(400000 + 400000) / 2 - (360000 + 400000) / 2

Percentage = difference / reference × 100=((400000 + 400000) / 2 - (360000 + 400000) / 2) / 380000 * 100

These figures measure contained copper in concentrate on a whole-project basis. They are not concentrate mass, shipments, capacity or MMG equity share. The October point forecast differs from a mere upper-end expectation.

How far above the October forecast was the annual actual?

Actual output 10,834 t above the upper bound

Reference guidance
400 kt
Reported actual
410.834 kt
2025 · Copper contained in concentrate · 100% project basis
Actual minus lower bound
+10,834 t (+2.71%)
Actual minus upper bound
+10,834 t (+2.71%)
Check values, sources and calculation

Swipe horizontally to see the full table.

ReferenceValue / disclosure dateObservation period / basisOriginal source / location
Reference disclosure400,000 t2025-10-212025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis
Compared disclosure410,834 t2026-01-222025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis

Recompute in tonnes. A midpoint is an arithmetic reference, not an issuer point forecast. Percentage changes use the corresponding reference value; a zero denominator has no percentage.

Actual minus lower bound=410834 - 400000

Percentage = difference / reference × 100=(410834 - 400000) / 400000 * 100

Actual minus upper bound=410834 - 400000

Percentage = difference / reference × 100=(410834 - 400000) / 400000 * 100

These figures measure contained copper in concentrate on a whole-project basis. They are not concentrate mass, shipments, capacity or MMG equity share. The October point forecast differs from a mere upper-end expectation.

How much production belongs to the second half?

Output for the intervening period: 200,197 t

Derived period output
200,197 t

Derived period: 2025-07-01 / 2025-12-31

Check values, sources and calculation

Swipe horizontally to see the full table.

ReferenceValue / disclosure dateObservation period / basisOriginal source / location
Reference disclosure210,637 t2025-07-222025-01-01 / 2025-06-30Copper contained in concentrate · 100% project basis
Compared disclosure410,834 t2026-01-222025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis

Recompute in tonnes. A midpoint is an arithmetic reference, not an issuer point forecast. Percentage changes use the corresponding reference value; a zero denominator has no percentage.

Derived period output=410834 - 210637

These figures measure contained copper in concentrate on a whole-project basis. They are not concentrate mass, shipments, capacity or MMG equity share. The October point forecast differs from a mere upper-end expectation.

Compare all five project examples

Cite this page with its project, observation period and calculation checked date. Historical examples do not establish today’s operating status or losses caused by an event.

Questions this evidence can answer

Checked: 2026-10-08 · Added: 2026-10-08

Which Las Bambas output is annual, and which guidance is the reference?

The full-year actual exceeds both the upper end of the original annual range and the later point guidance. Keep both reference points visible. Quarter-only output and cumulative half-year or nine-month output are separate periods and must not be added together.

These figures measure contained copper in concentrate on a whole-project basis. They are not concentrate mass, shipments, capacity or MMG equity share. The October point forecast differs from a mere upper-end expectation.

Swipe horizontally to see the full table.

DisclosurePeriodRecordValue (t)Product basisEvidence
2025-01-232025-01-01 – 2025-12-31 · FY · full yearGuidance · Initial360,000–400,000Copper contained in concentrate
2025-07-222025-01-01 – 2025-12-31 · FY · full yearGuidance · Maintained360,000–400,000Copper contained in concentrate
2025-10-212025-01-01 – 2025-12-31 · FY · full yearGuidance · Revised400,000Copper contained in concentrate
2025-07-222025-01-01 – 2025-06-30 · H1 · cumulativeReported actual210,637Copper contained in concentrate
2025-10-212025-07-01 – 2025-09-30 · Q3 · single quarterReported actual102,875Copper contained in concentrate
2026-01-222025-01-01 – 2025-12-31 · FY · full yearReported actual410,834Copper contained in concentrate

Disclosure and revision history

Historical entries were assembled from dated company filings.

How we check disclosures

Latest guidance status

Swipe horizontally to see the full table.

PeriodDisclosure dateStatusGuidance rangeBasisSource
2026-01-01 – 2026-12-31 · FY · full year2026-10-14Maintained400,000 tCopper contained in concentrate

Las Bambas and 35 other copper projects in one workbook

Open the workbook to compare annual figures and follow the source for each row. 47 records and 68 sources.

Actual production

Swipe horizontally to see the full table.

PeriodValueBasisSource
2025-01-01 – 2025-12-31 · FY · full year410,834 tCopper contained in concentrate
2026-01-01 – 2026-06-30 · H1 · cumulative210,195 tCopper contained in concentrate
2026-01-01 – 2026-09-30 · 9M · cumulative310,484 tCopper contained in concentrate
2026-07-01 – 2026-09-30 · Q3 · single quarter100,289 tCopper contained in concentrate

One or more linked sources in this table lack a page anchor; no page number was inferred.

Reserves and resources

Swipe horizontally to see the full table.

Reporting standardValid dateValueSource
JORC 20122026-06-30Total reserves: 4,664,000 t

One or more linked sources in this table lack a page anchor; no page number was inferred.

Basis notes

Follow the evidence

Take the latest project data

Latest project snapshot · Internal use only; no redistribution. Commercial use requires authorization.

Download latest CSV · Download latest JSON

Source: metalsgowhere.com, as of 2026-11-27. Citation & data use