HNI line rebuild
As of 2026-10-08 · Observation periods are shown separately.
2026-07-29 · HNI line rebuild · Direction: Lower
Disclosed facts
Swipe horizontally to see the full table.
| Assertion | Disclosure |
|---|---|
| Operating change | One Hengjaya Nickel RKEF line began a kiln and furnace rebuild in late June 2026. |
| Effective or planned period | The maintenance was expected to last about four months. |
Disclosure boundary
No separate lost-tonnage estimate; capacity multiplied by downtime is not used.
Status at disclosure
Planned maintenance; restart needs later confirmation
Source
One or more linked sources in this table lack a page anchor; no page number was inferred.
Source: metalsgowhere.com, as of 2026-10-08. Citation & data use