MetalsGoWhere

METALSGOWHERE ATLAS · SUPPLY RESEARCH

Hobart zinc smelter cuts production by about a quarter

As of 2026-10-08 · Observation periods are shown separately.

2025-03-12 · Hobart zinc smelter cuts production by about a quarter · Direction: Lower

Disclosed facts

Swipe horizontally to see the full table.

AssertionDisclosure
Plan or guidanceNyrstar announced a phased reduction of about 25% in Hobart plant production.
Effective or planned periodThe reduction was planned from April 2025 until further notice.

Disclosure boundary

This is the plant-level reduction, not the percentage change in global zinc supply.

Status at disclosure

Status as disclosed on this date

Source

One or more linked sources in this table lack a page anchor; no page number was inferred.

Supply event index

Source: metalsgowhere.com, as of 2026-10-08. Citation & data use