MetalsGoWhere

METALSGOWHERE ATLAS · SUPPLY RESEARCH

Kamoa-Kakula resets mine plan and annual supply path

As of 2026-10-08 · Observation periods are shown separately.

2026-03-31 · Kamoa-Kakula resets mine plan and annual supply path · Direction: Lower

Disclosed facts

Swipe horizontally to see the full table.

AssertionDisclosure
Plan or guidanceThe company set 2026 guidance at 290–330 thousand tonnes of copper in anode or blister.
Operational scopePrevious guidance of 380–420 thousand tonnes used copper-in-concentrate basis, so the two ranges are not directly comparable.

Disclosure boundary

The previous 380–420 kt was copper in concentrate. Because the product basis also changed, no like-for-like loss is calculated by subtraction.

Status at disclosure

Status as disclosed on this date

Source

One or more linked sources in this table lack a page anchor; no page number was inferred.

Supply event index

Source: metalsgowhere.com, as of 2026-10-08. Citation & data use