METALSGOWHERE ATLAS · SUPPLY RESEARCH
Kamoa-Kakula resets mine plan and annual supply path
As of 2026-10-08 · Observation periods are shown separately.
2026-03-31 · Kamoa-Kakula resets mine plan and annual supply path · Direction: Lower
Disclosed facts
Swipe horizontally to see the full table.
| Assertion | Disclosure |
|---|---|
| Plan or guidance | The company set 2026 guidance at 290–330 thousand tonnes of copper in anode or blister. |
| Operational scope | Previous guidance of 380–420 thousand tonnes used copper-in-concentrate basis, so the two ranges are not directly comparable. |
Disclosure boundary
The previous 380–420 kt was copper in concentrate. Because the product basis also changed, no like-for-like loss is calculated by subtraction.
Status at disclosure
Status as disclosed on this date
Source
One or more linked sources in this table lack a page anchor; no page number was inferred.
Source: metalsgowhere.com, as of 2026-10-08. Citation & data use