METALSGOWHERE ATLAS · SUPPLY RESEARCH
Kipushi logistics delay deliveries
As of 2026-10-08 · Observation periods are shown separately.
2026-07-29 · Kipushi logistics delay deliveries · Direction: Delay
Disclosed facts
Swipe horizontally to see the full table.
| Assertion | Disclosure |
|---|---|
| Delivery and inventory | Mine-to-port bottlenecks left approximately 44 thousand tonnes of contained zinc in unsold concentrate. |
| Plan or guidance | Annual production guidance remained 240–290 thousand tonnes of zinc; H2 destocking was expected. |
Disclosure boundary
An inventory level, not lost production. Annual 240–290 kt production guidance was unchanged.
Status at disclosure
Delayed delivery; destocking remains prospective
Source
One or more linked sources in this table lack a page anchor; no page number was inferred.
Source: metalsgowhere.com, as of 2026-10-08. Citation & data use