MetalsGoWhere

METALSGOWHERE ATLAS · SUPPLY RESEARCH

Kipushi logistics delay deliveries

As of 2026-10-08 · Observation periods are shown separately.

2026-07-29 · Kipushi logistics delay deliveries · Direction: Delay

Disclosed facts

Swipe horizontally to see the full table.

AssertionDisclosure
Delivery and inventoryMine-to-port bottlenecks left approximately 44 thousand tonnes of contained zinc in unsold concentrate.
Plan or guidanceAnnual production guidance remained 240–290 thousand tonnes of zinc; H2 destocking was expected.

Disclosure boundary

An inventory level, not lost production. Annual 240–290 kt production guidance was unchanged.

Status at disclosure

Delayed delivery; destocking remains prospective

Source

One or more linked sources in this table lack a page anchor; no page number was inferred.

Supply event index

Source: metalsgowhere.com, as of 2026-10-08. Citation & data use