METALSGOWHERE ATLAS · SUPPLY RESEARCH
San Ciprián resumes restart after Spain power outage
As of 2026-10-08 · Observation periods are shown separately.
2025-07-14 · San Ciprián resumes restart after Spain power outage · Direction: Higher
Disclosed facts
Swipe horizontally to see the full table.
| Assertion | Disclosure |
|---|---|
| Operating change | The 28 April 2025 Spain-wide power outage affected San Ciprián refinery and smelter, interrupting the smelter restart. |
| Effective or planned period | The company announced in July 2025 that the restart process would resume; completion was then expected by mid-2026. |
Disclosure boundary
Completion was then expected by mid-2026. Resuming a restart process does not mean full production in July.
Status at disclosure
Status as disclosed on this date
Source
One or more linked sources in this table lack a page anchor; no page number was inferred.
Source: metalsgowhere.com, as of 2026-10-08. Citation & data use