MetalsGoWhere

METALSGOWHERE ATLAS · SUPPLY RESEARCH

San Ciprián resumes restart after Spain power outage

As of 2026-10-08 · Observation periods are shown separately.

2025-07-14 · San Ciprián resumes restart after Spain power outage · Direction: Higher

Disclosed facts

Swipe horizontally to see the full table.

AssertionDisclosure
Operating changeThe 28 April 2025 Spain-wide power outage affected San Ciprián refinery and smelter, interrupting the smelter restart.
Effective or planned periodThe company announced in July 2025 that the restart process would resume; completion was then expected by mid-2026.

Disclosure boundary

Completion was then expected by mid-2026. Resuming a restart process does not mean full production in July.

Status at disclosure

Status as disclosed on this date

Source

One or more linked sources in this table lack a page anchor; no page number was inferred.

Supply event index

Source: metalsgowhere.com, as of 2026-10-08. Citation & data use