Nickel mine supply disruptions

As of 2026-11-03 · Observation periods are shown separately.

As of 2026-11-03

YTD estimated mine-production loss126.3 kt

3.40% of 2024 world mine output

What makes up the YTD total

Estimated mine-production loss · Each bar is a share of the same YTD total.

Event status and periods

Event periods, not measured daily losses. Full source dates appear beneath each lane.

2026-01-012026-11-03

Counted this year

Smelter-side events · separate (2)
Earlier structural halts · excluded (1)

Current conditions

Current annualised impact
14.4 kt
Ongoing events
1

The annualised figure is a current rate, not a full-year forecast. Do not add it to the YTD total.

As of 2026-11-03 · Denominator: 3.71 Mt · USGS Mineral Commodity Summaries 2026, world mine production 2024, metal content

Counted this year

Swipe horizontally to see the full table.

EventPeriodConfirmation and quantity basisYTD impactAnnualised if ongoingSource
Weda Bay mine in care and maintenance after reaching its initial 2026 RKAB quota2026-05-31 → 2026-09-10Resumed
Model estimate
124.4 kt—Primary source
ENC HPAL held near 30% of nameplate on water availability2026-09-15 → ongoingConfirmed, in force
Model estimate
1.9 kt14.4 ktPrimary source

Smelter-side events

Listed separately: the denominator is mine production.

Swipe horizontally to see the full table.

EventPeriodConfirmation and quantity basisYTD impactAnnualised if ongoingSource
Nickel Industries RKEF output cut to about three-quarters of nameplate on water shortage2026-10-01 → ongoingConfirmed, in force
Model estimate
2.8 kt31.2 ktPrimary source
Hengjaya Nickel: one RKEF line in planned overhaul for about four months2026-06-30 → 2026-10-31Confirmed, in force
Model estimate
2.5 kt—Primary source

Structural halts begun before last year

Shown for context; not in the year-to-date figure.

Swipe horizontally to see the full table.

EventPeriodConfirmation and quantity basisYTD impactAnnualised if ongoingSource
BHP Nickel West in temporary suspension since December 20242024-12-01 → ongoingConfirmed, in force
Model estimate
68.4 kt81.6 ktPrimary source

Recent months

Recalculated using current information · YTD impact at each month end, or the date shown above for the current month. Not a then-known forecast; YTD resets in January.

  • 2026-09124.9 kt
  • 2026-10126.2 kt
  • 2026-11126.3 kt

Swipe horizontally to see the full table.

MonthYTD impactShare of reference-year world outputAnnualised impact
2026-09124.9 kt3.37%14.4 kt
2026-10126.2 kt3.40%14.4 kt
2026-11126.3 kt3.40%14.4 kt

How this is counted

Source: metalsgowhere.com, as of 2026-11-03. Citation & data use