Kiruna / Kiirunavaara (Sweden; operator LKAB) reported 13,573,102 t of Iron ore concentrate · KA1–KA3 for 2025-01-01 – 2025-12-31 · FY · full year on a 100% project basis. Kiruna / Kiirunavaara (Sweden; operator LKAB) reported 291,758 t of Direct-sale lump ore and fines for 2025-01-01 – 2025-12-31 · FY · full year on a 100% project basis.

Latest annual actual production

Swipe horizontally to see the full table.

PeriodValueProduct and ownership basisDisclosure dateSource
2025-01-01 – 2025-12-31 · FY · full year13,573,102 tIron ore concentrate · KA1–KA3
100% project basis

Product weight; contained metal and moisture basis are not stated. Separate products and processing stages must not be added. Concentrate and pellet tables repeat the same mass; these are not additional volumes. Source: © Geological Survey of Sweden.

2026-06-22
2025-01-01 – 2025-12-31 · FY · full year291,758 tDirect-sale lump ore and fines
100% project basis

Product weight; contained metal and moisture basis are not stated. Separate products and processing stages must not be added. Concentrate and pellet tables repeat the same mass; these are not additional volumes. Source: © Geological Survey of Sweden.

2026-06-22

Iron ore research, ready to work with

Project-level tables, comparable historical changes and source-linked workbooks. Explore what the research packages contain.

Research packs Preview available · purchasing not open

Guidance

An annual guidance figure is not available on this page.

Project context

Sweden · LKAB · Mine

Source: metalsgowhere.com, as of 2026-10-24. Citation & data use