Mamico Phase1
Year to date10,500 t2026-01-01 – 2026-09-30 · 9M · cumulative · Lithium carbonate product 100% project basis January–September production at Phase I, on a 100% project basis. Separate from Zangge’s other lithium output; no 26.95% equity scaling.Original filing
As of 2026-10-24 · Observation periods are shown separately.
Project background and reporting periods
Mamico Phase1 (China; operator 西藏阿里麻米措矿业开发有限公司): an annual production figure is not available on this page.
Latest year-to-date actual production
Swipe horizontally to see the full table.
| Period | Value | Product and ownership basis | Disclosure date | Source |
|---|---|---|---|---|
| 2026-01-01 – 2026-09-30 · 9M · cumulative | 10,500 t | Lithium carbonate product 100% project basis January–September production at Phase I, on a 100% project basis. Separate from Zangge’s other lithium output; no 26.95% equity scaling. | 2026-10-20 |
Annual output for 3 lithium projects
This project has a reference entry. The workbook lists annual output for other projects in the pack. 11 records and 7 sources.
Guidance
An annual guidance figure is not available on this page.
Project context
China · 西藏阿里麻米措矿业开发有限公司 · Refinery
Source: metalsgowhere.com, as of 2026-10-24. Citation & data use