Kakula seismic event: reduced 2026–2027 mine plan
As of 2026-07-29 · Observation periods are shown separately.
2026 guidance is 290–310 kt copper in anode or blister against the pre-incident plan of 520–580 kt; recovery above 500 kt/yr is targeted from 2028. Loss is measured against the pre-incident guidance midpoint.
- Metal
- Copper
- Side
- Mine
- Country
- CD
- Period
- 2026-01-01 → ongoing
- Status
- Confirmed, in force
- Quantity basis
- Estimated mine-production loss
- Production basis
- 550.0 kt / yr · Pre-incident 2025 guidance midpoint 520–580 kt (Ivanhoe Mines)
- Affected share
- 45.5%
- Estimated daily impact
- 686 t/day
- Project page
- kamoa-kakula
Sources
- Ivanhoe Mines · Company or regulator document · 2026-03-31
- Ivanhoe Mines · Company or regulator document · 2026-07-29