METALSGOWHERE ATLAS · SUPPLY RESEARCH
Payable vs contained metal in concentrate
As of 2026-10-21 · Observation periods are shown separately.
Contained metal is what assays say is physically in the concentrate. Payable metal is the part the buyer pays for after the deductions written into the offtake contract: a payable percentage below 100%, minimum deductions, and sometimes penalties for impurities. Mines, smelters and traders therefore quote different tonnes for the same shipment. Country statistics and most mine reports use contained metal; sales and revenue use payable metal. The examples below are kept on their disclosed product basis.
Definitions
Swipe horizontally to see the full table.
| Term | Meaning |
|---|---|
| Contained metal | Concentrate tonnes multiplied by assayed grade; the physical quantity. |
| Payable metal | Contained metal after the contract's payable percentage, minimum deductions and penalties; the commercial quantity. |
| Concentrate (wet / dry tonnes) | Shipped weight includes moisture; grades and payables apply to dry tonnes. |
| Treatment and refining charges (TC/RC) | Fees deducted from the price, not from the tonnes; they change revenue, not payable quantity. |
| Cathode / refined metal | Finished metal where contained and payable converge at close to 100%. |
Mechanical rules
Swipe horizontally to see the full table.
| If | Then |
|---|---|
| A mine reports 'copper in concentrate' and a trader reports 'payable copper' for the same site. | Treat them as different bases; the payable figure is lower by the contractual deductions and cannot be used as production. |
| Only wet concentrate tonnes are disclosed. | Do not compute contained metal; moisture and grade are both missing. |
| Payable terms are not published. | Do not estimate payable metal from typical industry percentages; keep the record on the contained basis. |
Common misreadings
- Revenue divided by price does not give production; it gives payable quantity after deductions.
- A concentrate tonnage is not a metal tonnage.
- Two sites with the same contained metal can have different payable metal because contracts differ.
Examples from projects on this site
Records kept on their own basis: Each record keeps its disclosed product basis, ownership boundary and period; nothing is converted, summed or compared across bases on this page.
Swipe horizontally to see the full table.
| Record | Value | Unit | Data period | Basis | Ownership boundary |
|---|---|---|---|---|---|
| Kamoa-Kakula Reported actual Ivanhoe Mines | 385,808 | t | 2025-01-01 – 2025-12-31 · FY · full year | Copper contained in mine production | 100% project basis |
| Kinsevere Reported actual MMG | 52,791 | t | 2025-01-01 – 2025-12-31 · FY · full year | Copper cathode | 100% project basis |
Related research paths
Original sources and review evidence
- Ivanhoe Mines
Disclosure date: 2026-01-15
- MMG
Disclosure date: 2026-01-22
Updated: 2026-10-21
Standards and definitions cited
Definitions follow the documents below; check them for current versions. They are cited, not reproduced.
Follow the evidence
Source: metalsgowhere.com, as of 2026-10-21. Citation & data use