MetalsGoWhere

METALSGOWHERE ATLAS · SUPPLY RESEARCH

Payable vs contained metal in concentrate

As of 2026-10-21 · Observation periods are shown separately.

Contained metal is what assays say is physically in the concentrate. Payable metal is the part the buyer pays for after the deductions written into the offtake contract: a payable percentage below 100%, minimum deductions, and sometimes penalties for impurities. Mines, smelters and traders therefore quote different tonnes for the same shipment. Country statistics and most mine reports use contained metal; sales and revenue use payable metal. The examples below are kept on their disclosed product basis.

Definitions

Swipe horizontally to see the full table.

TermMeaning
Contained metalConcentrate tonnes multiplied by assayed grade; the physical quantity.
Payable metalContained metal after the contract's payable percentage, minimum deductions and penalties; the commercial quantity.
Concentrate (wet / dry tonnes)Shipped weight includes moisture; grades and payables apply to dry tonnes.
Treatment and refining charges (TC/RC)Fees deducted from the price, not from the tonnes; they change revenue, not payable quantity.
Cathode / refined metalFinished metal where contained and payable converge at close to 100%.

Mechanical rules

Swipe horizontally to see the full table.

IfThen
A mine reports 'copper in concentrate' and a trader reports 'payable copper' for the same site.Treat them as different bases; the payable figure is lower by the contractual deductions and cannot be used as production.
Only wet concentrate tonnes are disclosed.Do not compute contained metal; moisture and grade are both missing.
Payable terms are not published.Do not estimate payable metal from typical industry percentages; keep the record on the contained basis.

Common misreadings

Examples from projects on this site

Records kept on their own basis: Each record keeps its disclosed product basis, ownership boundary and period; nothing is converted, summed or compared across bases on this page.

Swipe horizontally to see the full table.

Examples from projects on this site
RecordValueUnitData periodBasisOwnership boundary
Kamoa-Kakula
Reported actual
Ivanhoe Mines
385,808t2025-01-01 – 2025-12-31 · FY · full yearCopper contained in mine production100% project basis
Kinsevere
Reported actual
MMG
52,791t2025-01-01 – 2025-12-31 · FY · full yearCopper cathode100% project basis

Related research paths

Original sources and review evidence

Updated: 2026-10-21

Standards and definitions cited

Definitions follow the documents below; check them for current versions. They are cited, not reproduced.

Follow the evidence

Source: metalsgowhere.com, as of 2026-10-21. Citation & data use