Copper concentrate, contained copper and cathode: compare the right tonnes
As of 2026-11-27 · Observation periods are shown separately.
Copper cathodes are refined metal. Copper concentrate is a mineral product sold at a stated grade. A shipment of 100 dry tonnes grading 25% copper contains 25 tonnes of copper before smelting losses or contract deductions. At Las Bambas, the production series measures copper contained in concentrate.
Compare the disclosures
The same metal and year do not make two numbers comparable. These examples show when product and plant boundaries prevent a calculation.
Calculation checked on 2026-10-25 · Maintenance: MetalsGoWhere; update when the underlying disclosure changes.
The second-quarter 2026 report calls guidance cathode production in its narrative, while the output-table footnote includes cathode, scrap and tolling. Preserve this disclosure difference: do not infer a matched product boundary or calculate a guidance fulfilment ratio from the mixed half-year total. Figures are project output, not equity-attributable output.
Do not use the mine-only annual actual to calculate a complex-guidance fulfilment delta. The January results release describes the revised range differently from the June revision; keep each dated disclosure and do not silently rewrite either historical range. No lost-tonnage estimate is inferred from disruption duration.
Can concentrate and anode guidance form one unchanged series?
No direct calculation
The product or production boundary differs; no conversion factor is assumed. The observation periods do not match this calculation.
Check values, sources and calculation
Swipe horizontally to see the full table.
Reference
Value / disclosure date
Observation period / basis
Original source / location
Reference disclosure
370,000–420,000 t2025-06-11
2025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis
Do not use the mine-only annual actual to calculate a complex-guidance fulfilment delta. The January results release describes the revised range differently from the June revision; keep each dated disclosure and do not silently rewrite either historical range. No lost-tonnage estimate is inferred from disruption duration.
Nil periods are not stored as zero and no annual total is formed for them. The 2024 guidance withdrawal is explicit; the 2025 withdrawal is read from guidance tables that exclude Cobre Panamá and carries the last published range rather than a new number. Concentrate sales from stockpile are a separate table on a sales basis and are not production. First Quantum describes the 2026 activity as stockpile processing, not a mine restart.
Can 2023 mine output be treated as 2026 stockpile processing?
No direct calculation
The observation periods do not match this calculation. The disclosure types do not support this calculation.
Check values, sources and calculation
Swipe horizontally to see the full table.
Reference
Value / disclosure date
Observation period / basis
Original source / location
Reference disclosure
330,863 t2024-02-20
2023-01-01 / 2023-12-31Copper contained in concentrate · 100% project basis
Nil periods are not stored as zero and no annual total is formed for them. The 2024 guidance withdrawal is explicit; the 2025 withdrawal is read from guidance tables that exclude Cobre Panamá and carries the last published range rather than a new number. Concentrate sales from stockpile are a separate table on a sales basis and are not production. First Quantum describes the 2026 activity as stockpile processing, not a mine restart.
Cite this page with its project, observation period and calculation checked date. Historical examples do not establish today’s operating status or losses caused by an event.