MetalsGoWhere

METALSGOWHERE ATLAS · SUPPLY RESEARCH

Copper concentrate, contained copper and cathode: compare the right tonnes

As of 2026-11-27 · Observation periods are shown separately.

Copper cathodes are refined metal. Copper concentrate is a mineral product sold at a stated grade. A shipment of 100 dry tonnes grading 25% copper contains 25 tonnes of copper before smelting losses or contract deductions. At Las Bambas, the production series measures copper contained in concentrate.

Compare the disclosures

The same metal and year do not make two numbers comparable. These examples show when product and plant boundaries prevent a calculation.

Calculation checked on 2026-10-25 · Maintenance: MetalsGoWhere; update when the underlying disclosure changes.

Kinsevere

Can mixed half-year output measure annual cathode guidance?

No direct calculation

The product or production boundary differs; no conversion factor is assumed. The observation periods do not match this calculation.

Check values, sources and calculation

Swipe horizontally to see the full table.

ReferenceValue / disclosure dateObservation period / basisOriginal source / location
Reference disclosure65,000–75,000 t2026-07-212026-01-01 / 2026-12-31Copper production guidance (product form not specified) · 100% project basis
Compared disclosure33,800 t2026-07-212026-01-01 / 2026-06-30Copper in cathode, scrap and tolling output · 100% project basis

The second-quarter 2026 report calls guidance cathode production in its narrative, while the output-table footnote includes cathode, scrap and tolling. Preserve this disclosure difference: do not infer a matched product boundary or calculate a guidance fulfilment ratio from the mixed half-year total. Figures are project output, not equity-attributable output.

Kamoa-Kakula

Are mine and complex totals the same production boundary?

No direct calculation

The product or production boundary differs; no conversion factor is assumed.

Check values, sources and calculation

Swipe horizontally to see the full table.

ReferenceValue / disclosure dateObservation period / basisOriginal source / location
Reference disclosure385,808 t2026-01-152025-01-01 / 2025-12-31Copper contained in mine production · 100% project basis
Compared disclosure388,838 t2026-01-152025-01-01 / 2025-12-31Complex copper in concentrate, including slag recovery · 100% project basis

Do not use the mine-only annual actual to calculate a complex-guidance fulfilment delta. The January results release describes the revised range differently from the June revision; keep each dated disclosure and do not silently rewrite either historical range. No lost-tonnage estimate is inferred from disruption duration.

Can concentrate and anode guidance form one unchanged series?

No direct calculation

The product or production boundary differs; no conversion factor is assumed. The observation periods do not match this calculation.

Check values, sources and calculation

Swipe horizontally to see the full table.

ReferenceValue / disclosure dateObservation period / basisOriginal source / location
Reference disclosure370,000–420,000 t2025-06-112025-01-01 / 2025-12-31Copper contained in concentrate · 100% project basis
Compared disclosure290,000–310,000 t2026-07-292026-01-01 / 2026-12-31Copper in disclosed smelter products (anode, blister and saleable slag concentrate where included) · 100% project basis

Do not use the mine-only annual actual to calculate a complex-guidance fulfilment delta. The January results release describes the revised range differently from the June revision; keep each dated disclosure and do not silently rewrite either historical range. No lost-tonnage estimate is inferred from disruption duration.

Cobre Panamá

Does the suspended range remain an active target?

No direct calculation

Guidance was withdrawn or suspended; the carried range is not an active forecast.

Check values, sources and calculation

Swipe horizontally to see the full table.

ReferenceValue / disclosure dateObservation period / basisOriginal source / location
Reference disclosure365,000–375,000 t2023-10-242023-01-01 / 2023-12-31Copper contained in concentrate · 100% project basis
Compared disclosure365,000–375,000 t2023-12-012023-01-01 / 2023-12-31Copper contained in concentrate · 100% project basis

Nil periods are not stored as zero and no annual total is formed for them. The 2024 guidance withdrawal is explicit; the 2025 withdrawal is read from guidance tables that exclude Cobre Panamá and carries the last published range rather than a new number. Concentrate sales from stockpile are a separate table on a sales basis and are not production. First Quantum describes the 2026 activity as stockpile processing, not a mine restart.

Can 2023 mine output be treated as 2026 stockpile processing?

No direct calculation

The observation periods do not match this calculation. The disclosure types do not support this calculation.

Check values, sources and calculation

Swipe horizontally to see the full table.

ReferenceValue / disclosure dateObservation period / basisOriginal source / location
Reference disclosure330,863 t2024-02-202023-01-01 / 2023-12-31Copper contained in concentrate · 100% project basis
Compared disclosure30,000–40,000 t2026-04-282026-01-01 / 2026-12-31Copper contained in concentrate · 100% project basis

Nil periods are not stored as zero and no annual total is formed for them. The 2024 guidance withdrawal is explicit; the 2025 withdrawal is read from guidance tables that exclude Cobre Panamá and carries the last published range rather than a new number. Concentrate sales from stockpile are a separate table on a sales basis and are not production. First Quantum describes the 2026 activity as stockpile processing, not a mine restart.

Cite this page with its project, observation period and calculation checked date. Historical examples do not establish today’s operating status or losses caused by an event.

An illustrative copper processing route
  1. Ore

    Ore mass includes copper and other material.

  2. Concentrate

    Concentrate mass and contained copper are different measures.

  3. Smelting intermediate

    Keep the stated intermediate product and its measurement basis.

  4. Refined product

    Read the refined product definition before comparing output.

Actual output

Material produced during a stated period.

Capacity

Stated capability on a defined operating and material basis.

Arrows show processing stages, not quantities or conversion ratios. Product definitions and routes vary.

Definitions

Swipe horizontally to see the full table.

TermMeaning
Ore massThe mass of mined material, including material other than copper.
Contained copperCopper content stated for a defined feed or product stream.
Anode, cathode and payable metalProduct or commercial measures whose definitions and boundaries must be read from the source.

Mechanical rules

Swipe horizontally to see the full table.

IfThen
Product form or production stage differs.Do not compare or add the values as if they were one measure.
A source reports ore mass but another reports copper content.Keep the figures separate unless a reviewed conversion with stated assumptions exists.
A basis is missing.Leave the basis unresolved rather than infer it from nearby wording.

Common misreadings

Examples from projects on this site

Separate product and stage records: The records retain their source-defined product and stage; they are not added together.

Swipe horizontally to see the full table.

Examples from projects on this site
RecordValueUnitData periodBasisOwnership boundary
Chile
Country observation
USGS Mineral Commodity Summaries 2026
5,300,000t2025-01-01 – 2025-12-31 · FY · full year · estimatedContained CopperNot stated in the public record
Kamoa-Kakula
Guidance
Ivanhoe Mines
520,000–580,000t2025-01-01 – 2025-12-31 · FY · full year · initialCopper contained in concentrate100% project basis

Related research paths

Original sources and review evidence

Updated: 2026-11-27

Follow the evidence

Source: metalsgowhere.com, as of 2026-11-27. Citation & data use