Methods for reading metals supply data

As of 2026-10-21 · Observation periods are shown separately.

Use definitions, reporting periods, boundaries and original sources to decide what a metals supply record can support.

Related research paths

Mining production vs capacity: what can be compared?

Production is output measured over a stated period. Capacity is a rated output capability on a stated basis; production guidance is an expectation, not either of those measures. Before estimating utilisation, match the facility, product, reporting boundary, unit and time basis. The sourced example below separates actual production from guidance. Without a matching capacity record, it cannot establish a utilisation rate.

Country totals and selected projects

A selected project collection is not a national total; inclusion is not coverage.

Copper concentrate, contained copper and cathode: compare the right tonnes

Copper cathodes are refined metal. Copper concentrate is a mineral product sold at a stated grade. A shipment of 100 dry tonnes grading 25% copper contains 25 tonnes of copper before smelting losses or contract deductions. At Las Bambas, the production series measures copper contained in concentrate.

Production guidance: original targets, revisions and actual output

Production guidance is an expectation for a specified period. Keep the original target, each dated revision and the eventual actual result separately. A warning about the lower end of a range is not automatically a numerical revision; a revised range is not realised output. To judge whether a target was met, match the same period, product and project or equity boundary. The Las Bambas and Kinsevere cases retain the original disclosures and explain the limits of comparison.

Comparing mine production across years when the reporting basis changes

An apparent production increase may reflect a different product mix, ownership boundary or reporting period. Compare the definitions before calculating growth. For Kinsevere, read the cathode, concentrate, scrap and tolling qualifications alongside each dated record instead of assuming that every copper figure measures the same thing. Where the issuer disclosures do not establish a matched boundary, report the difference and leave the growth or guidance-fulfilment calculation unavailable.

Selection is not a ranking

Inclusion is a research selection, not a world production ranking or operating-status certification.

Source editions and estimates

A source publication year and the observation year are different; retain estimates and revisions.

Aluminium stages are not additive

Bauxite, alumina and primary metal are successive stages; adding their masses double-counts material.

Attributable vs 100% basis: why shareholders report different numbers for the same mine

A joint-venture mine has one physical output, but each owner reports only its share of it. The 100% (project) basis is what the operation produced; the attributable (equity) basis is that total multiplied by the reporter's ownership percentage. Both numbers are correct, they answer different questions, and they must never be added or compared across bases. MetalsGoWhere records the basis on every row; Antamina, a four-owner copper-zinc mine in Peru, is kept on the 100% project basis below.

Fiscal year vs calendar year in mining reports

Mining companies report production for their own fiscal year. Many Australian-listed groups close their year on 30 June, so their 'FY2025' output covers July 2024 to June 2025; most other issuers and every USGS country table use the calendar year. A calendar-year figure and a June fiscal-year figure overlap by only six months and are not the same period. MetalsGoWhere keeps the exact period start and end on every record, so the examples below show the period before any comparison.

Payable vs contained metal in concentrate

Contained metal is what assays say is physically in the concentrate. Payable metal is the part the buyer pays for after the deductions written into the offtake contract: a payable percentage below 100%, minimum deductions, and sometimes penalties for impurities. Mines, smelters and traders therefore quote different tonnes for the same shipment. Country statistics and most mine reports use contained metal; sales and revenue use payable metal. The examples below are kept on their disclosed product basis.

CuEq (copper equivalent) meaning: definition, formula and why it is not comparable

CuEq (copper equivalent) is a single copper-tonnage figure that restates a mine's other metals — gold, silver, zinc, molybdenum — as copper: each metal's quantity multiplied by the price the reporter assumed, summed, then divided by the assumed copper price (sometimes adjusted for recoveries and payabilities). It is a company's own convenience metric: a different price deck or recovery assumption gives a different CuEq from the same physical output, and the assumptions are often not published. Country statistics never use it. MetalsGoWhere keeps each metal on its own record; Antamina appears below twice, once as copper and once as zinc, exactly as disclosed.

Lithium units: LCE, spodumene concentrate (SC6) and lithium content

100 dry tonnes of spodumene concentrate grading 6% Li₂O contain 6 tonnes of Li₂O. Multiply by 2.473 for 14.84 tonnes of lithium carbonate equivalent (LCE) before processing losses. For elemental lithium, 1 tonne Li equals about 5.323 tonnes LCE.

Nickel product forms: NPI, ferronickel, matte, MHP and Class 1 — counting contained nickel

Nickel leaves mines and smelters in very different forms. Nickel pig iron and ferronickel are iron alloys with a nickel grade; matte and mixed hydroxide precipitate (MHP) are intermediates; Class 1 nickel is refined metal that is LME-deliverable. Product tonnes are not nickel tonnes: a tonne of NPI may contain a tenth of a tonne of nickel. Country tables count contained nickel in mine output, and every MetalsGoWhere nickel record names the product form and its contained-nickel basis; the examples below show Indonesia's mine observation beside a ferronickel record kept on its contained-nickel basis.

Reserves vs resources: JORC, NI 43-101, S-K 1300 and why USGS reserves differ from company figures

A mineral resource is mineralisation with reasonable prospects of eventual economic extraction; a mineral reserve is the part of it that a study has shown can be mined economically now. Reserves are a subset of resources, and both change with prices, costs and drilling. Companies report under a code — JORC in Australia, NI 43-101 in Canada, S-K 1300 in the United States — while USGS publishes its own 'reserves' estimate on a broader, less formal basis. The difference is visible on the same printed table: USGS lists Australia's nickel reserves at 25 million tonnes and notes in the footnote that JORC-compliant or equivalent reserves were 11 million tonnes (Mineral Commodity Summaries 2026, printed page 133). Neither figure is annual production.

Exchange mechanics (LME)

How to read LME warrants, stocks, holding bands and spreads before drawing conclusions.

How to read LME stocks: live, cancelled and total

LME stocks are the metal held on warrant in LME-approved warehouses. The LME publishes them every business day by metal and location: opening stock, metal delivered in and out, closing stock, and how much of it is live or cancelled. Read the changes in that order before drawing any conclusion about tightness.

What does an LME cancelled warrant mean?

A cancelled warrant is an LME warrant whose owner has asked to take the metal out of the warehouse. It shows intent to load out, not scarcity by itself: the metal stays in the warehouse, and in total LME stock, until it is physically loaded out.

LME on-warrant vs off-warrant stocks: what is the difference?

On-warrant stock is metal covered by a live or cancelled LME warrant. Off-warrant stock is LME-brand metal held in LME-registered warehouses outside the warrant system; it is reported separately and cannot be delivered until it is placed on warrant.

LME warrant holding bands and lending rules: what do they mean?

For tom-next lending, compare the holder’s warrants and nearby positions with on-warrant stock. For front-month lending, divide its cumulative spot futures position by total available stock. Aluminium has a temporary tom-next threshold of 30% under Notice 26/284.

What does the LME cash–3M spread and backwardation mean?

The cash–3M spread is the gap between the LME cash prompt and the three-month prompt. Backwardation means the nearer price is higher; contango means it is lower. A backwardation shows the price of borrowing nearby metal, not proof of a squeeze.

Is a squeeze-risk score a squeeze probability?

No. The MetalsGoWhere daily score (0–100) adds up how many pressure conditions are present on the LME for each metal. It describes the current delivery structure; it does not estimate how likely a squeeze is or where prices will go.