Onça Puma
As of 2026-10-23 · Observation periods are shown separately.
Project background and reporting periods
Onça Puma is a nickel operation in Brazil operated by Vale Base Metals. In 2025 (2025-01-01 – 2025-12-31) it produced 26,000 t of nickel contained in ferronickel on a 100% project basis, as disclosed by Vale Base Metals. The tables below keep each disclosure's own period and source; a later actual does not establish whether the original expectation was met.
Actual production
Swipe horizontally to see the full table.
| Period | Value | Basis | Source |
|---|---|---|---|
| 2025-01-01 – 2025-12-31 · FY · full year | 26,000 t | Nickel contained in ferronickel |
One or more linked sources in this table lack a page anchor; no page number was inferred.
Onça Puma and 10 other nickel projects in one workbook
Open the workbook to compare annual figures and follow the source for each row. 19 records and 19 sources.
Reserves and resources
Swipe horizontally to see the full table.
| Reporting standard | Valid date | Value | Source |
|---|---|---|---|
| S-K 1300 | 2025-12-31 | Total reserves: 1,471,000 t |
One or more linked sources in this table lack a page anchor; no page number was inferred.
Resources
Swipe horizontally to see the full table.
| Reporting standard | Valid date | Value | Source |
|---|---|---|---|
| S-K 1300 | 2025-12-31 | Measured + indicated resources: 706,000 t; Inferred resources: 46,000 t; Resource excludes reserve |
One or more linked sources in this table lack a page anchor; no page number was inferred.
Basis notes
- Nickel contained in ferronickel
Take the latest project data
Latest project snapshot · Internal use only; no redistribution. Commercial use requires authorization.
Download latest CSV · Download latest JSONSource: metalsgowhere.com, as of 2026-10-23. Citation & data use