Grouped by production stage. Periods, products and scopes differ between projects, so entries are not a ranking and should not be added up.
Mine production
Peru · Mine production
Operator: Antamina JV
Production: 454,800 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained zinc · 100% project basis
Source: Teck · 2025 Annual Report · Teck · 2025 MD&A filed with SEC · 2026-02-19
Shared with copper. Zinc uses explicit 100% site output; Pb is not inferred.
China · Mine production · Operating system
Operator: Yunnan Chihong
Production: Not disclosed · Period: 2025-01-01 — 2025-12-31 · Basis: Zinc content in concentrate · 100% project basis
Source: Chihong 2025 Annual Report · 2026-03-27
Mine identity confirmed. The annual report gives combined lead-and-zinc metal design capacity; no arbitrary allocation to either metal. Independent annual metal output unverified.
China · Mine production · Operating system
Operator: Yunnan Chihong
Production: Not disclosed · Period: 2025-01-01 — 2025-12-31 · Basis: Zinc content in concentrate · 100% project basis
Source: Chihong 2025 Annual Report · 2026-03-27
Mine identity confirmed. The annual report gives combined lead-and-zinc metal design capacity; no arbitrary allocation to either metal. Independent annual metal output unverified.
Australia · Mine production
Operator: MMG
Production: 183,463 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained zinc · 100% project basis
Source: MMG · 2025第四季度生产报告 (Chinese) · 2026-01-22 · MMG · Production total by site(修订对照) (Chinese) · 2026-04-16
Uses 22 Jan 2026 release. Later portal Pb 21,664.59 t differs slightly from 21,666 t here; reconciliation pending.
China · Mine production · Single site
Operator: Zhongjin Lingnan
Production: Not disclosed · Period: 2025-01-01 — 2025-12-31 · Basis: Zinc content in concentrate · 100% project basis
Source: Zhongjin Lingnan 2025 share-issue prospectus · 2025-10-25
Fankou 180 kt/year is combined Pb/Zn concentrate-metal design capacity. No allocation to lead or zinc; independent CY2025 actual unverified.
Sweden · Mine production
Operator: Boliden
Production: 101,780 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained zinc · 100% project basis
Source: Boliden · Q4 / FY2025 · 2026-02-03
Calendar-2025 contained metal summed from four quarters. 2026 milled-ore guidance is separate and is not a metal-output loss.
China · Mine production · Operator group
Operator: Guangxi Huaxi
Production: 54,039.16 t · Period: 2025-01-01 — 2025-12-31 · Basis: Zinc content in concentrate · Operator-group scope
Source: Guangxi Huaxi Nonferrous 2025 Annual Report · 2026-04-22
Group own-output basis; toll-processing volumes are not added to own production or allocated to an undisclosed plant.
Congo (Kinshasa) · Mine production
Operator: Kipushi Corporation · Ivanhoe / Gécamines
Production: 203,168 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained zinc · 100% project basis
Source: Ivanhoe Mines · 2025 production / 2026 guidance · 2026-01-15
100% project contained Zn. Annual 203,168 t is taken as reported; conflicting FY2025 quarter totals are excluded. H1 production is separate from unsold port inventory.
Australia · Mine production
Operator: Glencore
Production: 274,600 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained zinc · 100% project basis
Source: Glencore Australia · McArthur River 2025
One mine; independent Pb/Zn observations. Annual output is not current operating status.
China · Mine production · Single site
Operator: Yunnan Chihong
Production: Not disclosed · Period: 2025-01-01 — 2025-12-31 · Basis: Zinc content in concentrate · 100% project basis
Source: Chihong 2025 Annual Report · 2026-03-27
Mine identity confirmed. The annual report gives combined lead-and-zinc metal design capacity; no arbitrary allocation to either metal. Independent annual metal output unverified.
India · Mine production
Operator: Hindustan Zinc
Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed
Source: Hindustan Zinc · Rampura Agucha
Site Pb/Zn output pending; no group allocation or ore-capacity substitution.
United States · Mine production
Operator: Teck
Production: 462,700 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained zinc · 100% project basis
Source: Teck · 2025 Annual Report · Teck · 2025 MD&A filed with SEC · 2026-02-19
Contained metals in concentrate; profit royalties are not an output haircut.
China · Mine production · Single site
Operator: Yunnan Chihong
Production: Not disclosed · Period: 2025-01-01 — 2025-12-31 · Basis: Zinc content in concentrate · 100% project basis
Source: Chihong 2025 Annual Report · 2026-03-27
Mine identity confirmed. The annual report gives combined lead-and-zinc metal design capacity; no arbitrary allocation to either metal. Independent annual metal output unverified.
Australia · Mine production
Operator: MMG
Production: 48,597 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained zinc · 100% project basis
Source: MMG · 2025第四季度生产报告 (Chinese) · 2026-01-22
Contained Pb/Zn in products; zinc-equivalent 139,959 t is excluded.
North Macedonia · Mine production
Operator: Central Asia Metals
Production: 17,881 t · Period: 2025-01-01 — 2025-12-31 · Basis: Contained zinc · 100% project basis
Source: Central Asia Metals · Sasa 年度生产表 (Chinese)
Contained metal, not concentrate dry mass or payable metal.
Smelting / refining
Sweden · Smelting / refining
Operator: Boliden
Quantity: Not disclosed · Period: Not disclosed · Basis: Not disclosed · Not disclosed
Source: Boliden Bergsöe · 2025铅合金产出 (Chinese)
Waste-battery recycling. 50 kt is alloy product mass only; pure-Pb output and nameplate remain unverified.
China · Smelting / refining · Single site
Operator: Yunnan Chihong
Nameplate capacity: 160,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Chihong 2025 Annual Report · 2026-03-27
Zinc is electrowon zinc; lead is crude lead, not refined lead. Alloy processing is not added again.
China · Smelting / refining · Single site
Operator: Yunnan Chihong
Nameplate capacity: 140,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Chihong 2025 Annual Report · 2026-03-27
Uses disclosed existing 140 kt zinc and 60 kt lead. Expansion targets of 200/100 kt are not treated as commissioned.
China · Smelting / refining · Single site
Operator: Yunnan Chihong
Nameplate capacity: 115,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Chihong 2025 Annual Report · 2026-03-27
China · Smelting / refining · Operator group
Operator: Yunnan Chihong
Production: 524,803.03 t · Period: 2025-01-01 — 2025-12-31 · Basis: Zinc ingots and alloys · Operator-group scope
Source: Chihong 2025 Annual Report · 2026-03-27
Group actual output is not allocated to individual bases; zinc includes alloys.
India · Smelting / refining
Operator: Hindustan Zinc
Nameplate capacity: 250,000 t/year · Period: 2025-01-01 — 2025-12-31 · Basis: zinc processing · 100% project basis
Source: Hindustan Zinc · Dariba Smelting Complex
Pb/Zn nameplates separate. Undated project page; source-check date is not commissioning date.
China · Smelting / refining · Operator group
Operator: Guangxi Huaxi
Production: 33,712.92 t · Period: 2025-01-01 — 2025-12-31 · Basis: Zinc ingots · Operator-group scope
Source: Guangxi Huaxi Nonferrous 2025 Annual Report · 2026-04-22
Group own-output basis; toll-processing volumes are not added to own production or allocated to an undisclosed plant.
China · Smelting / refining · Single site
Operator: Xinjiang Kunlun Zinc
Nameplate capacity: 560,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: ENFI: Huoshaoyun EPC contract · 2023-12-28 · Xinjiang EIA approval: Huoshaoyun Pb/Zn smelter · 2024-07-25 · Xinjiang Finance Department: smelter power supply completed
2025 government report confirms design products of 560 kt zinc and 110 kt lead. The 600 kt project title is not a metal allocation. First zinc does not establish full ramp-up. Luopu smelter is separate from the mine.
China · Smelting / refining · Single site
Operator: Henan Jinli
Nameplate capacity: 100,000 t/year · Period: Not disclosed · Basis: Zinc ingots · 100% project basis
Source: ENFI: Jinli project roasting workshop commissioning · 2023-01-20
Project lines only, not total Jinli group capacity. Workshop commissioning does not by itself establish full ramp-up.
Finland · Smelting / refining
Operator: Boliden
Production: 290,000 t · Period: 2025-01-01 — 2025-12-31 · Basis: zinc processing · 100% project basis
Source: Boliden Kokkola · 芬兰语设施资料 (Chinese) · Boliden Kokkola · 2025设施产出 (Chinese)
Nameplate capacity: 315,000 t/year · Period: 2025-01-01 — 2025-12-31 · Basis: zinc processing · 100% project basis
Source: Boliden Kokkola · 芬兰语设施资料 (Chinese) · Boliden Kokkola · 2025设施产出 (Chinese)
315 kt/y capacity and 290 kt 2025 output are separate; no Pb value inferred.
Korea, Republic of · Smelting / refining · Single site
Operator: Korea Zinc
Nameplate capacity: 640,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Korea Zinc 2025 Annual Report (corrected KRX filing) · 2026-06-01
Production: 600,006 t · Period: 2025-01-01 — 2025-12-31 · Basis: Refined zinc · 100% project basis
Source: Korea Zinc 2025 Annual Report (corrected KRX filing) · 2026-06-01
Corrected annual filing: parent Onsan site, excluding Australian Sun Metals. IR business-plan sales are not substituted for production.
China · Smelting / refining · Operating system
Operator: Nanfang Nonferrous
Nameplate capacity: 700,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Nanfang 2024–2025 Responsible Supply Chain Report
Combined scale of the two companies at the Nandan base, disclosed in the 2025 report; not allocated to individual workshops.
France · Smelting / refining · Single site
Operator: Nyrstar
Nameplate capacity: Not disclosed · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Nyrstar company facility disclosure
Site and zinc cathodes confirmed; current capacity and annual output unverified.
Netherlands · Smelting / refining · Single site
Operator: Nyrstar
Nameplate capacity: 315,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Nyrstar company facility disclosure
Historic curtailment announcement: 315 kt nameplate, not CY2025 actual or proof of current operation.
Australia · Smelting / refining · Single site
Operator: Nyrstar
Nameplate capacity: 280,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Nyrstar company facility disclosure
Company page declares up to 280 kt/year; effective capacity date and CY2025 actual unverified.
Canada · Smelting / refining
Operator: Teck
Production: 229,900 t · Period: 2025-01-01 — 2025-12-31 · Basis: zinc processing · 100% project basis
Source: Teck · 2025 Annual Report · Teck · 2025 MD&A filed with SEC · 2026-02-19
Refined output is separate; nameplate pending. Residues/recycling feed is not added to metal output.
China · Smelting / refining · Single site
Operator: Yunnan Chihong
Nameplate capacity: 50,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Chihong 2025 Annual Report · 2026-03-27
China · Smelting / refining · Single site
Operator: Zhuzhou Smelter Group
Nameplate capacity: 300,000 t/year · Period: Not disclosed · Basis: Refined zinc · 100% project basis
Source: Zhuzhou Smelter Group 2025 Annual Report · 2026-04-17
300 kt zinc smelting; 380 kt alloy processing is not additional smelting capacity.