Latest annual actual production

Swipe horizontally to see the full table.

PeriodValueProduct and ownership basisDisclosure dateSource
2025-01-01 – 2025-12-31 · FY · full year101,780 tzinc contained in concentrates
100% project basis
2026-02-03
2025-01-01 – 2025-12-31 · FY · full year188,294 tZinc concentrate · gross product weight
100% project basis

Product weight; contained metal and moisture basis are not stated. Separate products and processing stages must not be added. Source: © Geological Survey of Sweden.

2026-06-22

Garpenberg and 10 other zinc projects in one workbook

Open the workbook to compare annual figures and follow the source for each row. 26 records and 29 sources.

As of 2026-10-24 · Observation periods are shown separately.

Project background and reporting periods

Garpenberg (Sweden; operator Boliden) reported 101,780 t of zinc contained in concentrates for 2025-01-01 – 2025-12-31 · FY · full year on a 100% project basis. Garpenberg (Sweden; operator Boliden) reported 188,294 t of Zinc concentrate · gross product weight for 2025-01-01 – 2025-12-31 · FY · full year on a 100% project basis.

Production through time

Zinc in concentrate production

Calendar year · 100% operation · tonnes

Zinc in concentrate production0tonnes96,1272023109,0542024101,7802025
Annual actuals only; gaps are not interpolated.

2024 → 2025 · -7,274 t (-6.7%)

View values and original sources
PeriodTonnesSource & location
2023-01-01 / 2023-12-3196,127Original disclosure
PDFp36, Garpenberg, Production of metal in concentrate, Zinc tonnes, 2023 column
2024-01-01 / 2024-12-31109,054Original disclosure
Original disclosure
Full-year data per unit /2025 production / 2024 actual
2025-01-01 / 2025-12-31101,780Original disclosure
Original disclosure
Full-year data per unit /2025 production / 2025 actual

Guidance

An annual guidance figure is not available on this page.

Project context

Sweden · Boliden · Mine