Trail
Annual disclosure229,900 t2025-01-01 – 2025-12-31 · FY · full year · refined zinc 100% project basisOriginal filing Guidance190,000–230,000 tMaintained · 2026-01-01 – 2026-12-31 · FY · full year · refined zinc 100% project basisOriginal filing As of 2026-10-24 · Observation periods are shown separately.
Project background and reporting periods
Trail (Canada; operator Teck Metals Ltd.) reported 229,900 t of refined zinc for 2025-01-01 – 2025-12-31 · FY · full year on a 100% project basis.
Production through time
Refined zinc production
Calendar year · 100% operation · tonnes
Annual actuals only; gaps are not interpolated.2024 → 2025 · -26,100 t (-10.2%)
View values and original sources
| Period | Tonnes | Source & location |
|---|
| 2022-01-01 / 2022-12-31 | 248,900 | Original disclosure PDFp22, Trail Operations narrative, 2022 refined zinc comparator |
|---|
| 2023-01-01 / 2023-12-31 | 266,600 | Original disclosure PDFp22, Trail Operations narrative, 2023 refined zinc production |
|---|
| 2024-01-01 / 2024-12-31 | 256,000 | Original disclosure trail / 2025 annual production narrative / 2024 actual |
|---|
| 2025-01-01 / 2025-12-31 | 229,900 | Original disclosure trail / 2025 annual production narrative / 2025 actual |
|---|
Latest annual actual production
Swipe horizontally to see the full table.
Trail Operations and 10 other zinc projects in one workbook
Open the workbook to compare annual figures and follow the source for each row. 26 records and 29 sources.
Latest guidance status
Swipe horizontally to see the full table.
Project context
Canada · Teck Metals Ltd. · Smelter
Source: metalsgowhere.com, as of 2026-10-24. Citation & data use