MetalsGoWhere

Kevitsa

11,627 t2025-01-01 – 2025-12-31 · FY · full year · nickel contained in concentrates 100% project basisOriginal filing

As of 2026-10-24 · Observation periods are shown separately.

Project background and reporting periods

Kevitsa (Finland; operator Boliden) reported 11,627 t of nickel contained in concentrates for 2025-01-01 – 2025-12-31 · FY · full year on a 100% project basis.

Production through time

Nickel in concentrate production

Calendar year · 100% operation · tonnes

Nickel in concentrate production0tonnes9,943202311,529202411,6272025
Annual actuals only; gaps are not interpolated.

2024 → 2025 · +98 t (+0.9%)

View values and original sources
PeriodTonnesSource & location
2023-01-01 / 2023-12-319,943Original disclosure
PDFp37, Kevitsa, Production of metal in concentrate, Nickel tonnes, 2023 column
2024-01-01 / 2024-12-3111,529Original disclosure
Original disclosure
Full-year data per unit /2025 production / 2024 actual
2025-01-01 / 2025-12-3111,627Original disclosure
Original disclosure
Full-year data per unit /2025 production / 2025 actual

Latest annual actual production

Swipe horizontally to see the full table.

PeriodValueProduct and ownership basisDisclosure dateSource
2025-01-01 – 2025-12-31 · FY · full year11,627 tnickel contained in concentrates
100% project basis
2026-02-03

Kevitsa and 10 other nickel projects in one workbook

Open the workbook to compare annual figures and follow the source for each row. 19 records and 19 sources.

Guidance

An annual guidance figure is not available on this page.

Project context

Finland · Boliden · Mine

Source: metalsgowhere.com, as of 2026-10-24. Citation & data use